Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 46%

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

NYC-WTC_000447891–000448022
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 29 of 124

7.0 PROJECT/TASK DESCRIPTION

This section provides a general overview of the activities that will be performed and how and when they will be performed. Specific details for individual project activities will be discussed in later sections of the QAPP.

7.1 Project Overview

Based upon the companion document Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project, August 2005, the primary objective of this investigation is to monitor air quality in the vicinity of 130 Liberty Street during the deconstruction of the building on that property. The plan consists of monitoring of dust in the vicinity of the deconstruction site on both a real-time or continuous basis as well as a time-weighted or integrated basis. These objectives will be satisfied by the sampling and analysis program outlined in Sections 7.1.1 and 7.1.2. Laboratories performing these analyses are summarized in Section 4.3.4 of the QAPP.

There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 130 Liberty Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:

“Level 1”: The subcontractors performing aspects of Phase I deconstruction work (largely interior, non-structural efforts) will be responsible for collecting air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA.

• “Level 2”: The next layer of sampling is for ICR 56 compliance. ICR 56-required sampling will entail sampling the ambient air inside the building during Phase I work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In addition, samples will be collected, as required, outside the building within ten (10) feet of the negative pressure ventilation exhaust. This sampling is further described in the Asbestos and COPC Abatement and Removal Plan sections of the Deconstruction Plan (August, 2005).

“Level 3”: Beyond that, there will be continuous monitoring of the exterior ambient air within the site boundaries and at specific elevated locations, as described in the Ambient Air Monitoring Program (August 2005). This QAPP further defines the technical approach and provides the anticipated schedule of activities for the “Level 3” air monitoring. The other two “levels” of air monitoring outlined above are documented in the Health and Safety Plan and The Asbestos and COPC Abatement and Removal Plan sections of the Deconstruction Plan (August, 2005).

CITY_21MC100_003219865

NYC-WTC_000447920

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447920Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →