NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan, Ambient Air Monitoring

Machine-extracted title · confidence 46%

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

NYC-WTC_000447891–000448022
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 4 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 16 of 124

• Coordinating activities in the field, • Assigning specific duties to field team members, • Ensuring site security and access, • Training field staff, • Overseeing and coordinating field data collection, • Mobilizing and demobilizing of the field team and subcontractors to and from the site, • Resolving any logistical problems that could potentially hinder field activities, such as equipment malfunctions or availability, personnel conflicts, or weather-dependent working conditions, • Implementing field quality control (QC) including issuance and tracking of measurement and test equipment; the proper labeling, handling, storage, and shipping of samples; chain-of- custody procedures; and control and collection of all field documentation, and • Assisting with report preparation.

Field Staff

The field staff reports directly to the TRC Field Sampling Coordinator. The responsibilities of the field team include:

• Understanding and implementing QAPP requirements as they relate to their duties, • Collecting samples, conducting field measurements, and decontaminating equipment according to documented procedures stated in the QAPP, • Ensuring that field instruments are properly operated, calibrated, and maintained, and that adequate documentation is kept for all instruments, • Performing technical procedures and data recording in accordance with the operating procedures, • Collecting the required QC samples and thoroughly documenting QC sample collection, • Ensuring that field documentation and data are complete and accurate, and • Communicating any nonconformance or potential data quality issues to the TRC Field Sampling Coordinator.

4.3.4 Laboratory Responsibilities

Analyses will be performed by the following organizations:

CITY_21MC100_003219852

NYC-WTC_000447907

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447907Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →