10.0 QUALITY ASSURANCE/QUALITY CONTROL
10.1 Overview
The program described herein will be performed by the Environmental Subcontractor under
subcontract to Contractor, the overall general contractor for the 130 Liberty Street
Deconstruction Project. The Contractor Environmental Subcontractor will assume responsibility
for the collection and analyses of all samples identified previously in Sections 5 and 6 of this
plan. The Contractor Environmental Subcontractor/Contractor Team will assume responsibility
for the quality of all data to be collected in the conduct of the deconstruction project. LMDC in
its role as property owner will utilize its independent Environmental Consultant to serve in an
oversight role to the Contractor monitoring activities. This oversight role will include additional
QA/QC measures to be implemented by LMDC and its consultants to further insure that all
monitoring data meet predetermined data quality goals and objectives. A separate document or
Quality Assurance Project Plan (QAPP) will be prepared and issued for agency review and
comment. This QAPP will provide details on all QA/QC measures to be put in place by the
Contractor Environmental Subcontractor/Contractor Team for the deconstruction monitoring
program. This QAPP will also identify all of the additional QA/QC measures to be undertaken
by the LMDC consultant to fulfill its oversight function for this program.
10.2 Contractor Environmental Subcontractor/Contractor Quality Assurance/Quality
Control
The Contractor Environmental Subcontractor/Contractor Team will have primary responsibility
for implementation of all program Quality Control measures identified in the QAPP. These will
include but not be limited to the following types of QA/QC features:
• Data Quality Objectives
• Detection Limit Goals
• Data Capture Goals
• Chain of Custody
• Calibration Procedures and Erequencies
• Eield Blanks
• Lab Blanks
• Collocated Samples
• Matrix Spikes
• Lab Control Spikes
• Lab Method Blanks
• Field Surrogate Spikes
• Lab Surrogate Spikes
• Corrective Action Measures
Elements of QA/QC typically contained in a QAPP are listed in Table 6.
L2005-149(051205) 1 5023623.2
CITY_21MC100_0 02652334
NYC-WTC_000447750
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000447750Source: NYC Law Department, mirrored locally