Quality Assurance Plan, Ambient Air Monitoring, LMDC

Machine-extracted title · confidence 39%

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

NYC-WTC_000447031–000447162
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 88 of 124

Table 13-la. Maintenance, Testing, and Inspection Activities Associated with Metals (TSP filters) Collected with High Volume Samplers Acceptance Equipment Activity Corrective Action Criteria Gaskets At 3 month intervals, No leaks or Replace as necessary inspect all gaskets in the compression damage sampler evident Brushes Replace after 600 - Stable How rate Replace as necessary 1000 hrs. of operation Motor Replace as needed Consult manufacturer Obtain the correct for correct model of model motor Tubing and fittings Visually inspect daily No crimps, cracks, or Replace as necessary obstructions; no crossthreading

Mcrcurt ((iascoiis) rsinh a Direct Rcad Aiialxzer

Table 13-lb summarizes the inspection, testing, and maintenance activities associated with the gaseous mercury analysis using the Ohio Lumex RA915+ mercury analyzer.

Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Lumex RA915+ Mercury Analyzer Fault Symptom Possible Cause Corrective Action Segments of tlie indicator table - Power cable is out of -Repah tlie power cable on the display and control unit order arc not highlighted when the analyzer is switched on. - Display unit cable is - Repair the display unit out of order cable

- Battery is discharged - Charge the battery

The (*) symbol at the display - Battery is discharged - Charge the battery and control panel is not dimmed out when the "Lamp ignition" button is pressed:

-if the optical switch is in - Operation is possible only with -Set the optical switch into position I attachments positions II or III

- if the optical switch is in - The single-pass cell is - Remove the single-path cell, position II contaminated, compartment check if the compartment windows aie contaminated or windows are clean, make sure foreign objects are found in the that there are no foreign objects compartment inside the compartment

- if the optical switch is in - Multi-path cell is - Clean the multi-path cell position III contaminated (see appropriate section)

The battery discharge indicator The battery is fully discharged Charge the battery

CITY_21MC100_003212834

NYC-WTC_000447119

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447119Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →