NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan, Ambient Air Monitoring, LMDC

Machine-extracted title · confidence 39%

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

NYC-WTC_000447031–000447162
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 15 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 115 of 124

15,3 Additional QAPP Non-Conformances

15.3.1 Field Non-Conformances

Corrective action in the field may be needed when the sample network is changed (i.e., more/less samples, sampling locations other than those specified in the QAPP), or when sampling procedures and/or field analytical procedures require modification, etc. due to unexpected conditions. The field team may identify the need for corrective action. The TRC Field Sampling Coordinator will approve the corrective action and notify the TRC Project Manager and TRC QA Officer. The TRC Project Manager, in consultation with the EPA Region 2 Project Manager, if necessary, will approve the corrective action. The TRC Field Sampling Coordinator will ensure that the corrective action is implemented by the field team. Corrective actions will be implemented and documented in the field logbook. Documentation will include:

• A description of the circumstances that initiated the corrective action, • The action taken in response, • The final resolution, and • Any necessary approvals.

No staff member will initiate corrective action without prior communication of findings through the proper channels as described above All corrective actions will take into account the possible effect on the data. If necessary, a problem resolution audit will be conducted.

15.3.2 Laboratory Non-Conformances

Corrective action in the laboratory may occur prior to, during, and after initial analyses. A number of conditions such as broken sample media, omissions or discrepancies with chain-of- custody documentation, and potentially high concentration samples may be identified during sample log-in or just prior to analysis. Following consultation with laboratory analysts and Laboratory Section Leaders, it may be necessary for the Laboratory QA Manager to approve the implementation of corrective action. The analytical methods specify some conditions during or after analysis that may automatically trigger corrective action or optional procedures. These conditions may include dilution of samples, additional sample extract cleanup, automatic reinjection/reanalysis when certain QC criteria are not met, loss of sample through breakage or spillage, etc. If the corrective action is not clear, the Laboratory QA Manager must notify the TRC Project Manager and TRC QA Officer. All parties will decide and approve a subsequent corrective action procedure that will not adversely affect the achievement of project objectives.

The analyst may identify the need for corrective action. The Laboratory Section Leader, in consultation with the staff, will approve the required corrective action to be implemented by the laboratory staff. The Laboratory QA Manager will ensure implementation and documentation of the corrective action. If the nonconformance causes project objectives not to be achieved, the

CITY_21MC100_003212861

NYC-WTC_000447146

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447146Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →