NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
NYC-WTC_000445985–000446084OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Environmental Protection Agency Pt. 763. Subpt. E. App. B 6. If the Z-statistic is less than or equal to 3. Minor repairs to damaged thermal sys 1.65, the lesponse action is complete. If the tem insulation which do not require re Z-statistic is greater than 1.65, reclean the moval. abatement site and collect a new set of sam 4. Repairs to a piece of asbestos-containing ples. wallboard. 5. Repairs, involving encapsulation, enclo [52 FR41857, Oct. 30, 1987] sure or removal, to small amounts of friable asbestos-containing material only if required Appendix B to Subpart t; Work in the performance of emergency or routine Practices and Engineering Ccn- maintenance activity and not intended sole TROLS FOR SMAEL-SCAEE, SHORT- ly as asbestos abatement. Such work may Duration Operations Mainte not exceed amounts greater than those nance AND Repair (O&M) Activi which can be contained in a single prefab ties INVOLVING ACM ricated minienclosure. Such an enclosure shall conform spatially and geometrically to This appendix is not mandatory, in that the localized work area, in order to perform LEAs may choose to comply with all the re its intended containment function. quirements of 40 CFR 763.121. Section OSHA concluded that the use of certain en 763.91(b) extends the protection provided by gineering and work practice controls is capa BPA in its 40 CER 763.121 for worker protec ble of reducing employee exposui'es to asbes- tion during asbestos abatement projects to tos to levels below employees of local education agencies who the final standard’s action level (0.1 f/cm^). perform small-scale, short-duration oper (See 51 FR 22714, June 20, 1986.) Several con ations, maintenance and repair (O&M) ac trols and work practices, used either singly tivities involving asbestos-containing mate or in combination, can be employed effec rials and aie not covered by tire OSHA asbes tively to reduce asbestos exposures during tos consti-uction standard at 29 CFR 1926.58 small maintenance and renovation oper or an asbestos worker protection standard ations. These include: adopted by a State as part of a State plan 1. Wet methods. approved by OSHA under section 18 of the 2. Removal methods. Occupational Safety and Health Act. Em i. Use of glove bags. ii. Removal of entire asbestos insulated ployers wishing to be exempt from the re pipes or structures. quirements of §763.121 (e)(6) and (f)(2)(i) may iii. Use of minienclosures. instead comply with the provisions of this 3. Enclosure of asbestos materials. appendix when performing small-scale, 4. Maintenance programs. short-duration O&M activities. This appendix describes these controls and Definition of Small-Scale, Short-Duration work practices in detail. Activities Preparation of the Area Before Renovation For the purposes of this appendix, small- or Maintenance Activities scale, short-duration maintenance activities The first step in preparing to perform a are tasks such as, but not limited to: small-scale, short-duration asbestos renova 1. Removal of asbestos-containing insula tion or maintenance task, regardless of the tion on pipes. abatement method that will be used, is the 2. Removal of small quantities of asbestos removal from the work area of all objects containing insulation on beams or above that are movable to protect them from as ceilings. bestos contamination. Objects that cannot 3. Replacement of an asbestos-containing be removed must be covered completely with gasket on a valve. 6-mil-thick polyethylene plastic sheeting be 4. Installation or removal of a small sec fore the task begins. If objects have already tion of drywall. been contaminated, they should be thor 5. Installation of electrical conduits oughly cleaned with a High Efficiency Par through or proximate to asbestos-containing ticulate Air (HEPA) filtered vacuum or be materials. wet-wiped before they are removed from the Small-scale, short-duration maintenance work area or completely encased in the plas activities can be further defined, for the pur tic. poses of this subpart, by the following con WeZ methods. Whenever feasible, and re siderations: gardless of the abatement method to be used 1. Removal of small quantities of asbestos (e.g., removal, enclosure, use of glove bags), containing materials (ACM) only if required wet methods must be used during small- in the performance of another maintenance scale, short-duration maintenance and ren activity not intended as asbestos abatement. ovation activities that involve disturbing as 2. Removal of asbestos-containing thermal bestos-containing materials. Handling asbes system insulation not to exceed amounts tos materials wet is one of the most reliable greater than those which can be contained in methods of ensuring that asbestos fibers do a single glove bag. not become airborne, and this practice
705
CITY_21MC100_003216642
NYC-WTC_000446041
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
28 shared non-person entities · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
Pallet of Part 763 asbestos-related standard references and definitions.
Similar indexed content
NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
Similar indexed content
NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
Similar indexed content
NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similar indexed content