NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
NYC-WTC_000445985–000446084OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
§763.91 40 CFR Ch. I (7-1-00 Edition) (4) An action may also be considered erence was approved by the Director of complete if the volume of air drawn for the Federal Register in accordance each of the five samples collected with with 5 U.S.C. 552(a) and 1 CFR part 51. in the affected functional space is The method is incorporated as it exists equal to or greater than 1,199 1. of air on the effective date of this rule, and a for a 25 mm filter or equal to or greater notice of any change to the method than 2,799 L of air for a 37 mm filter, will be published in the FEDERAL REG and the average concentration of asbes ISTER. tos as analyzed by the TEM method in (6) To determine the amount of appendix A of this subpart E, for the ACBM affected under paragraph (i)(5) five air samples does not exceed the fil of this section, the local education ter background level, as defined in ap agency shall add the total square or pendix A, of 70 structures per square linear footage of ACBM within the con millimeter (70 s/mm^). If the average tainment barriers used to isolate the concentration of asbestos of the five functional space for the action to re air samples within the affected func move, encapsulate, or enclose the tional space exceeds 70 s/mm 7 or if the ACBM. Contiguous portions of material volume of air in each of the samples is subject to such action conducted con- less than 1,199 L of air for a 25 mm fil currently ।or at approximately the ter or less than 2,799 L of air for a 37 same time within the same school mm filter, the action shall be consid building shall not be separated to qual ered complete only when the require ify under paragraph (i)(5), of this sec ments of paragraph (i)(3) or (i)(5), of tion. this section are met. [52 FR 41846, Oct. 30, 1987, as amended at 53 (5) At any time, a local education ER 12525, Apr. 15, 1988; 60 FR 31922, June 19, agency may analyze air monitoring 1995; 60 FR 34465, July 3, 1995] samples collected for clearance pur poses by phase contrast microscopy §763.91 Operations and maintenance. (PCM) to confirm completion of re (a) Applicability. The local education moval, encapsulation, or enclosure of agency shall implement an operations, ACBM that is greater than small-scale, maintenance, and repair (O&M) pro short-duration and less than or equal gram under this section whenever any to 160 square feet or 260 linear feet. The friable ACBM is present or assumed to action shall be considered complete be present in a building that it leases, when the results of samples collected owns, or otherwise uses as a school in the affected functional space and building. Any material identified as analyzed by phase contrast microscopy nonfriable ACBM or nonfriable as using the National Institute for Occu sumed ACBM must be treated as friable pational Safety and Health (NIOSH) ACBM for purposes of this section Method 7400 entitled “Fibers” pub when the material is about to become lished in the NIOSH Manual of Analyt friable as a result of activities per ical Methods, 3rd Edition, Second Sup formed in the school building. plement, August 1987, show that the (b) Worker protection. The protection concentration of fibers for each of the provided by EPA at 40 CFR 763.121 for five samples is less than or equal to a worker protection during asbestos limit of quantitation for PCM (0.01 fi abatement projects is extended to em bers per cubic centimeter (0.01 17cm ') of ployees of local education agencies who air). The method is available for public perform operations, maintenance, and inspection at the Office of the Federal repair (O&M) activities involving ACM Register, 800 North Capitol Street, NW, and who are not covered by the OSHA Suite 700, Washington, DC, 20408, and asbestos construction standard at 29 the Non-Confidential Information Cen CFR 1926.58 or an asbestos worker ap ter (NCIC) (7407), Office of Pollution proved by OSHA under section 1 9 of the Prevention and Toxics, U.S. Environ Occupational Safety and Health Act. mental Protection Agency, Room B—607 Local education agencies may consult NEM, 401 M Street, SW., Washington, appendix B of this subpart if their em DC, 20460, between the hours of 12 p.m. ployees are performing operations, and 4 p.m. weekdays excluding legal maintenance, and repair activities that holidays. This incorporation by ref- are of small-scale, short-duration.
6S8
CITY_21MC100_003216595
NYC-WTC_000445994
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
28 shared non-person entities · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
Pallet of Part 763 asbestos-related standard references and definitions.
Similar indexed content
NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
Similar indexed content
NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
Similar indexed content
NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similar indexed content