NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Pre-bid/scope memo for asbestos air monitoring and on-site staff requirements.
NYC-WTC_000445979–000445983OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Crystalline silica in air 0.5|J.g/m^ Secondary clearance level PAHs in settled dust <0.3 mg/m'__________ Secondary clearance level Mercury between 1 and 2 mg/m ’ Secondary clearance level
2. Cleaning shall not be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 5 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_21MC100_009200668
NYC-WTC_000445983
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433215
DEP scope of work for 125 Cedar Street interior dust monitoring and abatement oversight.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446617
Chain-of-custody describing pre-bid/site walkthrough and asbestos monitoring setup.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452493
DEP pre-bid meeting notice and background for asbestos cleaning at WTC site.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435996
Chain of custody noting pre-bid walk-through at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433703
DEP/WTC project scope describing building debris, dust, and required asbestos air monitoring during cleaning.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430503
Plan and responsibilities for on-site asbestos air monitoring and debris cleanup.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416644
Pre-bid meeting and scope for environmental monitoring during interior cleaning.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284079
Mandatory pre-bid and monitoring scope for asbestos abatement and air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000433215
DEP scope of work for 125 Cedar Street interior dust monitoring and abatement oversight.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452493
DEP pre-bid meeting notice and background for asbestos cleaning at WTC site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000433215
DEP scope of work for 125 Cedar Street interior dust monitoring and abatement oversight.
Similar indexed content
NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
Similar indexed content
NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
Similar indexed content
NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
Similar indexed content