NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
92 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
NYC-WTC_000444945–000445073OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005
• In the event that dust levels exceed target and trigger action levels, building deconstruction management personnel will be immediately notified so that all necessary corrective actions can be taken. • Monitor PMio and PM2.5 on a time-weighted or 24-hour average basis to provide assurances that levels of respirable particulate matter associated with the deconstruction are below the 24 hour National Ambient Air Quality Standards (NAAQS) of 150 ug/m3 and 65 ug/ms, respectively. • Collect particulate matter on a time-weighted or integrated basis such that samples are available for monitoring of target compounds potentially associated with World Trade Center dust (e.g., asbestos, lead). • Compare measured concentrations of project target parameters to action levels established on a compound-specific basis. In the event that measured concentrations exceed any project specific action level for one or more of these target compounds, appropriate corrective actions immediately will be taken. A project timeline is provided as Figure 6-2. • Collect waste stream samples for RCRA analyses in support of the Waste Management Plan (WMP) to characterize, manage, containerize, and legally transport and dispose of waste streams that will be generated as part of the 133- 135 Greenwich Street/21-23 Thames Street Deconstruction Project.
6.3 Project Action Levels
A two-tiered system will be in place during the entire term of the deconstruction project. This system includes use of both Target Air Quality Levels and USEPA Site Specific Trigger Levels for each of the target parameters. A summary listing of the Action Levels provided on a parameter-specific basis is shown in Table 6-3.
6.3.1 Decisions Based on Project Action Levels The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern. In the event that the deconstruction project is shut down on account of an exceedance of an air quality action level, monitoring for all parameters will continue. The purpose of the continuation of monitoring will be to demonstrate that concentrations have been restored to acceptable levels.
6.3.2 Target Air Quality Levels 6.3.2.1 Definitions of Exceedances Any 24-hour PM2.5 and PM 10 value in excess of the Target Air Quality Level will be considered an “exceedance” and the actions described below will be taken. During the first week of sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific Trigger Level, will be considered an exceedance and the actions described below will be taken. Following the first week of sampling, a rolling average will be established based initially on the first week’s results, to which will be added daily values as results are received from the laboratory. A rolling average value for any analyte other than PM2.5 and
20
CITY_21MC100_0 03240666
NYC-WTC_000444964
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
92 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440780
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
92 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443742
Chain-of-custody form for Environmental Community Air Monitoring Program plans at Greenwich Street and Thames Street, dated November 4, 2005.
92 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427716
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444496
Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453085
Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
Similar indexed content
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
Similar indexed content
NYC-WTC_000443742
Chain-of-custody form for Environmental Community Air Monitoring Program plans at Greenwich Street and Thames Street, dated November 4, 2005.
Similar indexed content
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
Similar indexed content
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similar indexed content