NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames
NYC-WTC_000444890–000444927OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 Rev 2 September 16, 2005
5.0 DATA VALIDATION AND QUALITY ASSURANCE AUDIT
This section outlines the procedures necessary for the data validation and quality assurance audit, which ensures the accuracy of the results.
5.1 Data Validation
Data validation is a systematic procedure of reviewing a body of data against a set of established criteria so as to provide a specified level of assurance of its validity prior to its intended use. The review of the data will include an audit of the quality control samples—the laboratory’s method blanks, field blanks, spikes, and surrogate recoveries. These quality control samples allow a direct check on the variability in the methods of analysis and sampling and in the sample matrix itself. The data will be reviewed by the laboratory’s QA Officer for compliance to the technical specifications and completeness. The laboratory will provide a non-conformance summary as appropriate for the analytes determined. Included in the non-conformance summary will be notification of sample receipts. This will include information regarding problems with sample packaging. Chain of Custody and sample preservation. A preliminary review for deviations from method protocols including holding times, surrogate recoveries, and spike recoveries will be reviewed.
The QA Officer will evaluate a number of criteria including the following: • Chain of Custody completeness; • Analyses completed versus analyses planned; • Time held versus holding times; • Laboratory blanks (method and instrument); • Laboratory Control Sample; • Trip and field blank results; and • Duplicate analyses precision.
Deficiencies discovered by the contracted laboratory QA Officer will be documented and communicated to the Airtek QA Officer, the Project Manager, and the Laboratory. The impact of deficiencies on use of the data will be evaluated by the Airtek QA Officer and the Project Manager.
5.2 Laboratory Audits
During the laboratory analyses, Airtek QA Officer will be in direct contact with the laboratory to check on the project status. Any technical concern will be discussed during these updates, and formalized in writing by the contracted laboratory. A telefax may be used. Any significant problems impacting either the holding times, or the analytical methodologies, or the deliverable package will be determined.
5.3 Field Audits
The purpose of QA field audits is to ensure compliance with the approved SAP and QAPP. During the performance of the sampling procedures, the QA Officer will make on site audits. Deviations from the approved plans will be brought to the attention of the Field Manager and the Project Manager. All deviations will be recorded in the QA Officer’s log and field notebook of
31
CITY_21MC100_0 03235166
NYC-WTC_000444920
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
37 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
25 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Cover page for Part II of an environmental community air monitoring and deconstruction plan document prepared for the State of New York regarding 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427900
Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423885
Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similar indexed content
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similar indexed content
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similar indexed content