NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames
NYC-WTC_000444890–000444927OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 Rev 2 September 16, 2005
2.3.3 Analysis Requirements: All samples must be analyzed by an analytical laboratory that is state-certified (NYS DOH ELAP and/or NIST NVLAP) in the analytical methods appropriate for the samples being collected. 2.34 Equipment Maintenance and Inspection: All equipment used for sampling and analysis must be routinely inspected and maintained to ensure its accuracy. Procedures for calibration and maintenance of Airtek sampling equipment can be found in manufacmrers procedures. Calibration frequency is tracked in the IH Instrumentation and Calibration tracking log.
2.4 Procedure Sample collections are documented using the Sample Collection Form and Composite Collection Form and each collection is divided into shipments, each of which has its own Chain of Custody Form. The shipments are sent to a commercial lab for analysis. Results are received via hard copy and/or electronic data deliverables, entered into the sample tracking database, and reviewed for completeness and accuracy. The following procedure describes the workflow for routine samples. 2.4.1 Sample Collection and Data Entry Airtek Sample Team Lead Specifies collection sites, samples, and frequency of collection. Specifies analyses to be performed, analytical laboratories to be used, and required turnaround time for receipt of results. Airtek Samnle Collection Staff Initiates collection in database and prints out Sample and Composite Collection Forms and sample vial labels. Records all of the required information on the appropriate Sample and Composite Collection Forms while taking samples. Enters data from the Sample and Composite Collection Forms into the database. Consults with the Sample Team Lead regarding questionable samples and ensures all questions regarding samples are resolved before proceeding. Generates and prints chain of custody documents. Transfers samples and all documentation to the Airtek Quality Coordinator. Signs and records date and time on Chain-of-Custody Form under “Relinquished by.” Airtek Project Manager Accepts samples and documentation from Sample Collection Staff. Signs and records date and time on Chain-of-Custody Form under “Accepted by.” Verifies samples collected and entries on sample collection and Chain-of Custody Forms for correctness and completeness. Resolves any problems with Sample Collection Staff, Sample Team Lead, and Data Manager as necessary.
2.4.2 Sending Samples to Analytical Laboratories
23
CITY_21MC100_0 03235158
NYC-WTC_000444912
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
37 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
25 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Cover page for Part II of an environmental community air monitoring and deconstruction plan document prepared for the State of New York regarding 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similar indexed content
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similar indexed content
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similar indexed content