NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
16.2.3 Representativeness........................................................................................ 118
16.2.4 Sensitivity and Quantitation Limits............................................................ 119
16.2.5 Completeness................................................................................................ 119
16.2.6 Data Limitations and Actions...................................................................... 119
17.0 REPORTING, DOCUMENTS, AND RECORDS.................................... 120
Tables
Table 3-1. Distribution List...................................................................................... .9
Table 6-1. Target Air Quality Levels and USEPA Site-Specific Trigger Levels 22
Table 7-la. Background Phase - One Week (7 Consecutive Days)................... 28
Table 7-lb. Abatement Phase: Asbestos and COPC Abatement and Removal . 28
Table 7-lc. Demolition Phase - Structural Deconstruction ................................ 28
Table 7-2. Abatement Phase: Asbestos and COPC Abatement and Removal
Sampling and Analysis Summary........................................................................... 29
Table 7-3. Demolition Phase - Structural Deconstruction Phase Sampling and Analysis Summary
29
Table 8-la. Comparison of Laboratory Quantitation Limits with Project Action Levels 33
Table 8.1b Comparison of Laboratory Quantitation Limits with RCRA Regulatory
Lvls........................................................................................................................... 35
Table 8.1c Comparison of Laboratory Quantitation Limits with Project Action Limts............. 36
Table 8-2. Measurement Performance Criteria Table - Metals by ICP/MS .............................. 39
Table 8-3. Measurement Performance Criteria Table - PAHs by GC/MS-SIM......................... 40
Table 8-4. Measurement Perfonnance Criteria Table - PCBs by GC/ECD............................... 42
Table 8-5. Measurement Performance Criteria Table - PCDDs/PCDFs by HRGC/HRMS..... 43
Table 8-6. Measurement Performance Criteria Table - Mercury by CVAFS............................ 44
Table 8-7. Measurement Performance Criteria Table - Silica by XRD..................................... 46
Table 8-8. Measurement Performance Criteria Table - Asbestos by TEM/SEM(1)................. 47
Table 8-9. Measurement Performance Criteria Table - PMIO and PM2.5 by Gravimetry...... 48
TABLE 8.10. Measurement Perfonnance Criteria Waste Sample Analysis -VOC, SVOC,
Pesticides/Herbicides/PCB, Metals/ Mercury, pH ........................................................................ 49
Table 10-1. RCRA Waste Characterization Analytical Method, Container, Preservation and
Holding Times for selected aqueous and non-aqueous matrices................................................... 65
Table 11-1. Summary of Preparation and Analytical Methods.................................................... 70
Table 12-1. Summary of Media, Preservation, and Holding Time Requirements..................... 81
Table 12-2. Waste Samling - Aqueous and (Solid) Summary of Media, Preservation, and
Holding Time Requirements............................................................................................................ 82
Table 13-la. Maintenance, Testing, and Inspection Activities Associated with Metals
(MCE filters) Collected with Low Volume Area Samplers ......................................................... 85
Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Lumex
RA915-I- Mercury Analyzer............................................................................................................. 88
Table 13-lc. Maintenance, Testing, and Inspection Requirements for the PS-1 Sampler
Used for PCDDs/PCDFs and PAHs ............................................................................................... 90
Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed
Laboratory Analyses......................................................................................................................... 89
Table 13-3 a. Calibration Requirements for Low Volume Area Samplers.................................. 91
Table 13-3b. Calibration Requirements for the Ohio Lumex PA915+ Mercury Analyzer...... 92
Table 13-3c. Calibration Requirements for PS-1 Samplers ......................................................... 93
Table 13-4a. Summary of Calibration Procedures for Fixed Laboratory Analyses................... 98
TABLE I.1.4h Summary of Calibration Procedures for Fixed Laboratory Analyses
Waste Sample Analysis - VOC, SVOC, Pesticides/Herbicides/PCB, Metals/ Mercury, pH... 99
6
CITY_21MC100_0 07120858
NYC-WTC_000443747
OCR can misread numbers and units. Confirm readings against the page image before using them.