NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos regulation Part 56, NYS DOL

Machine-extracted title · confidence 37%

State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.

NYC-WTC_000443384–000443496
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

where work shall be performed at least three (3) calendar days prior to commencement of work.

(C) Other Notice. If an emergency makes it impossible to provide the notice required by Subdivision (a) or (b) of this Section, the property owner and asbestos abatement contractor shall post or otherwise provide for written notice to residential and business occupants of the building/structure, as soon as practicable after identification of the project, in the manner set forth in Section 56- 3.5.

(d) Duration of Posting. Posted notices shall remain in place until completion of the project.

(e) Content. Each notice shall include the following information:

(1) The building/structure address and room location(s) or area designation of the asbestos project;

(2) The amounts and types of ACM, PACM or asbestos material, in square feet and/or linear feet, that is being handled, removed, enclosed, encapsulated, repaired or disturbed. Piping, fittings and associated insulation (excluding breeching and large [2 foot or greater] diameter piping/fittings/associated insulation) are to be measured in linear feet;

(3) The commencement and completion dates of the asbestos project, including any intermediate portions of the project;

(4) The name and asbestos handling license number of the asbestos abatement contractor performing the project; and

(5) The name and address of the air monitor asbestos contractor and laboratory for the project.

(f) Noninterference. No person shall interfere with the obligations of the property owner and asbestos abatement contractor under this Section.

12 NYCRR56 Subparts, Page 34

CITY_21MC100_011984855

NYC-WTC_000443418

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443418Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →