NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos regulation Part 56, NYS DOL

Machine-extracted title · confidence 37%

State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.

NYC-WTC_000443384–000443496
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

person, company, unincorporated association, firm, partnership or corporation in whom legal title to the premises is vested unless the premises are held in land trust, in which instance building/structure owner means the person in whom beneficial title is vested.

(af) Building/structure Owner’s Authorized Representative. A licensed asbestos contractor firm contractually responsible for execution of any building owner’s responsibility, as required by this Part, during any phase of an asbestos project at the building owner's building/structure.

(ag) Bulk Sampling. Accepted methods for collecting samples of suspect materials for appropriate analyses by NYS ELAP approved laboratories, to determine asbestos content.

(ah) Category I Non-Friable ACM. NESHAP classification - Asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos, that when dry, can not be crumbled, pulverized, or reduced to powder by hand pressure.

(ai) Category II Non-Friable ACM. NESHAP classification - Any material, excluding Category I Non-Friable ACM, containing more than one percent (1%) asbestos, that when dry, can not be crumbled, pulverized, or reduced to powder by hand pressure.

(aj) Class I Asbestos Work. OSHA term meaning activities involving the abatement of Thermal Systems Insulation (TSI), and surfacing ACM and PACM.

(ak) Class II Asbestos Work. OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.

(al) Class III Asbestos Work. OSHA term meaning Repair and Maintenance operations, where no more than a minor quantity of ACM, including TSI and surfacing ACM and PACM, is likely to be disturbed.

(am) Class IV Asbestos Work. OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust, waste and debris resulting from Class I, II and III activities.

(an) Clean Room. An uncontaminated area or room, which is a part of the personal decontamination enclosure, with provisions for storage and changing of persons’ street clothes and protective equipment.

(ao) Cleanup. The utilization of HEPA-vacuuming or wet cleaning or both to control and eliminate accumulations of asbestos material and asbestos waste material.

12 NYCRR56 Subpart 2, Page 11

CITY_21MC100_011984832

NYC-WTC_000443395

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443395Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →