NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
NYC-WTC_000443384–000443496OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
56-11.8 Abandoned Pipe/Duct/Conduit Wrap and Cut Removal. The following Phase II abatement procedures shall apply for wrap and cut removal of asbestos containing or ACM covered abandoned pipes/ducts/conduits. All other requirements of this Part shall apply:
(a) Air Sampling and Analysis. Air sampling and analysis on an asbestos project conducted under this Section shall be conducted in accordance with the requirements of Subpart 56-4 of this Part. (b) Regulated Abatement Work Area Preparation. (1) Establishment of Regulated Abatement Work Areas. Each regulated abatement work area shall be established and signage posted as per the requirements of Section 56-7.4. Each regulated abatement work area shall remain vacated except for certified workers until satisfactory clearance air sampling results have been obtained or the asbestos project is complete. (2) Preliminary Preparation. Regulated abatement work area preparation shall also comply with Section 56-7.1 through Section 7.11 (d). (i) Exception. For exterior regulated abatement work areas with ACM, PACM or asbestos material intact, establishment of negative air systems as per Section 56-7.8, and installation of isolation barriers as per Section 7.11(b) is not required. Remote decontamination system enclosures are allowed for exterior regulated abatement work areas. (3) Critical Barriers. Prior to the placement of critical barriers, affected surfaces shall be pre-cleaned using HEPA-filtered vacuum equipment and wet cleaning methods. All critical barriers shall be installed as per Section 56-7.11 (a) and all seams of HVAC or other system components that pass through a regulated abatement work area shall be sealed prior to beginning Phase II B work for each regulated abatement work area on the project. The critical and isolation barriers shall be removed only after satisfactory clearance air sampling results have been obtained. (4) Limitations. Full regulated abatement work area negative pressure enclosure preparation as per Section 56-7.11 (a, b and e) is not required if the following removal conditions are followed: (i) The ACM, PACM or asbestos material must be intact, and the wetted pipe/duct/conduit shall be wrapped in two (2) independent layers of at least six (6) mil fire-retardant plastic sheeting and sealed airtight. (ii) A one-layer dropcloth of at least six (6) mil fire-retardant plastic sheeting shall be utilized below the ACM, PACM or asbestos material during all wrapping operations. (iii) Insulation removals to allow for cuts of pipe/duct/conduit and cuts for removal of ACM pipe/duct/conduit or sections thereof shall be
12 NYCRR56 Subpart 11, Page 110
CITY_21MC100_011984931
NYC-WTC_000443494
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
25 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
25 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411802
COSH-related NYC RO regulatory chapter on asbestos control.
17 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
Similar indexed content
New York City Part 56 asbestos documentation, NYC-WTC.
Similar indexed content
NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similar indexed content
NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
Similar indexed content
NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
Similar indexed content