NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Project Plan, AMBIENT AIR MONITORING, 130 LIBERTY ST

Machine-extracted title · confidence 42%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

NYC-WTC_000443239–000443370
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z Z r: r: o Ambient Air Monitoring Program Section No. 12 o co g Quality Assurance Project Plan Revision No.: 0 o 130 Liberty Street - NY, NY Date: September 7, 2005 I Lower Manhattan Development Corporation Page 80 of 124 “0 c o o CT o o' Ca3 "0 Ca5 o 03 CD Table 12-1. Summary of Media, Preservation, and Holding Time Requirements Estimated Preservation Maximum Holding O o Analytical Parameter Analytical Method Media o Sample Volume Requirements Time c Metals SW-846 Method 6020A 1440 m" (1000 L/min 8” X 10” quartz fiber None 180 days to analysis 3 CD for 24 hours) filter 3

Total Mercury EPA method 324, 0.576 m^ (0.4 L/min for 2 small iodated carbon None 28 days to analysis modified 24 hours) haps in series Asbestos (TEM) AHERA 2.88 m’ (6 L/min for 25mm diameter cassette None None minimum of 8 hours) with 0.45 pm pore size, mixed cellulose ester filter Asbestos (SEM) German VDl Method 2.88 m^ (6 L/min for 25mm diameter cassette None None 3492 minimum of 8 hours) with 0.1 pm pore size, polycarbonate filter Silica-Respirable NIOSH Method 7500 1.0 m’ SKC aluminum cyclone; None None (2.0-2.1 L/min for 8 37 mm diameter hours) cassette with 5.0 pm pore size, polyvinyl chloride filter Particulate PMio 40 CFR Part 50, 24.05 n? 47 mm Teflon filters None None Appendix J (16.7 L/min for 24 hours) Particulate PM2.5 40 CFR Part 50, 24.05 m" 47 mm Teflon filters None None Appendix L (16.7 L/min for 24 hours) Dioxins/Furans EPA Method TO-9A 288 m^ (200 L/min for Quai tz fiber filter and Cool to 4°C 30 days to extraction; 45 24 hours) PUF cartridge days from extraction to analysis PCBs SW-846 Method 8082 7.2 m (5 L/min for 24 PUF cartridge Cool to 4°C; keep in 14 days to extraction; 40 o hours) dark days from exhaction to H k; analysis I to PAHs SW-846 Method 8270C 288 m^ (200 L/min for Quaitz fiber filter, Cool to 4°C; keep in 14 days to exhaction; 40 s O 24 hours) PUF/XAD-2 sandwich cartridge dark days from exhaction to analysis o o I o o co to co

co

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443319Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →