NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
NYC-WTC_000443239–000443370OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 67 of 124
PAH samples will be collected using high-volume air samplers fitted with non-size selective quartz fiber filters and sorbent cartridges. This approach, as described in EPA Method TO-13A, does not collect particulate matter representative solely of potential inhalation exposure, but provides for a total of respirable and non-respirable PAHs. Sorbent traps containing polyurethane foam (PETE) and XAD-2® resin in a “sandwich” configuration. The General Metals Works (GMW) PS-1 high volume sorbent sampler (or performance equivalent) located at each monitoring station will be operated at a flow rate of 200 to 300 liters per minute with a sampling period of approximately 24 hours for a resulting total air volume of approximately 288 m^ - 432 m^
The filters and sorbent cartridges will be solvent pre-cleaned and vacuum dried by the analytical laboratory. The pre-cleaned filters and cartridges will be stored wrapped in aluminum foil (or otherwise protected from light) in a Ziploc bag, and over wrapped with bubble wrap until they are carefully installed on the sampler on site.
At the conclusion of each sampling period, the sample is recovered from the sampling train by placing the filter inside the glass cartridge. The cartridge is then wrapped with aluminum foil and it is placed back into its original shipping container, labeled, and transported to the analytical laboratory for processing.
The amount of air sampled through the filters and cartridges will be recorded and the filter/cartridge set placed in an appropriately labeled container and shipped to the laboratory for analysis.
Equipment and supplies utilized with this sampling approach are as follows:
• High-Volume Sampler - General Metals Works model PS-1 (or performance equivalent). Capable of pulling ambient air through the filter/sorbent cartridge at a flow rate of approximately 200-300 1pm over a 24-hour sampling period.
• Sampling Module - Metal filter holder capable of holding a 102-mm circular particle filter supported by a 16-mesh stainless-steel screen and attaching to a metal cylinder capable of holding a 65-mm O.D. (60-mm I.D.) x 125-mm borosilicate glass sorbent cartridge containing PUP and XAD-2® resin in the “sandwich” configuration. To ensure air-tight seals, the filter holder is equipped with inert sealing gaskets placed on either side of the filter and inert pliable gaskets placed at either end of the glass sorbent cartridge.
• High-Volume Sampler Calibrator - Capable of providing multi-point resistance for the high- volume sampler.
• Quartz Fiber Filter - 102 mm binderless quartz microfiber filter. (Provided by the laboratory, pre-cleaned and weighed.)
CITY_21MC100_003237760
NYC-WTC_000443306
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content