Quality Assurance Project Plan, AMBIENT AIR MONITORING, 130 LIBERTY ST

Machine-extracted title · confidence 42%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

NYC-WTC_000443239–000443370
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 39 of 124

Phase II - Structural Deconstruction

During Phase II of the deconstruction project, air monitoring will take place at twelve (12) stations each day. During the first three (3) days only of Phase II, samples will be collected and analyzed for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, sampling for semivolatile organics will be reduced to a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The schedule will be repeated until project completion.

The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after consideration of the PMio data corresponding to the sites and days where organic samples were collected. The station with the highest 24-hour average PMw concentration (ug/m’) recorded with a collocated organic sample each week will be selected for analyses.

Monitoring will cease at project completion pursuant to completion of deconstruction plan activities.

7.1.2 Analytical Tasks

In February 2002, a multi-agency task force headed by the USEPA was formed to evaluate indoor environments for the presence of contaminants related to the WTC terrorist attacks that might pose long-term health risks to local residents. As part of this evaluation, a task force sub­ committee was established to identify Contaminants of Potential Concern (COPC Committee) that are likely associated with the WTC disaster and establish health-based benchmarks for those contaminants in support of planned residential cleanup efforts in Lower Manhattan.

In addition, a number of other studies conducted by USEPA (EPA/600/R-03/142 December 2003) and work performed by Louis Berger Group were examined as a means of establishing a listing of target parameters appropriate to satisfy the purpose and objectives of the current deconstruction project. These objectives include monitoring of dust potentially related to the deconstruction as well as identifying levels of COPCs associated with the materials at 130 Liberty Street. In this manner the deconstruction project can proceed while providing an ample margin of safety for human health and the environment in the vicinity of the project site.

Based upon these criteria, the following target parameters were selected for inclusion in the monitoring program:

• PMio-Respirable Particulate • PM2,5-Respirable Particulate • Asbestos

CITY_21MC100_003237732

NYC-WTC_000443278

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443278Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →