NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Project Plan, AMBIENT AIR MONITORING, 130 LIBERTY ST

Machine-extracted title · confidence 42%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

NYC-WTC_000443239–000443370
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 37 of 124

Table 7-4. Summary of Relevant Information-Sampling Locations Direction from Conformance to Upwind or Site Location 130 EPA/ACOE Expected Use of Data Downwind Liberty Street Siting Criteria Ground Level - Southwest Predominantly Does not Meet Represents Primarily Washington St Corner Upwind Building Upwind/Background /Albany Street /Roadway Setback Contributions; Also Distances Represents Downwind Contributions Some % of the Time. Gr ound Level- Soutlreast Predominantly Does not Meet Represents Primarily Albany Corner Downwind Building Downwind Contributions; St/Greenwich St /Roadway Setback Also Represents Upwind Distances /Background Contributions Some % of the Time. Ground Level- Northeast Predominantly Does not Meet Represents Primarily Greenwich St Corner Downwind Building Downwind Contributions; /Roadway Setback Also Represents Upwind Distances /Background Contributions Some % of the Time. Ground Level- Northwest Predominantly Does not Meet Represents Primarily Washington Corner Upwind Building Upwind/Background St/Cedar St. /Roadway Setback Contributions; Also Distances Represents Downwind Contributions Some % of the Time. Scaffolding at Northwest Predominantly Does not Meet Represents Primarily Building Comer; Corner Upwind Building Setback Upwind/Background Floating Elevation Distances Contributions; Also Represents Downwind Contributions Some % of the Time. Also Represents Any Emissions in the Immediate Vicinity of the Scaffolding Monitoring Station at Elevation. Scaffolding at Southwest Predominantly Does not Meet Represents Primarily Building Corner; Corner Upwind Building Setback Upwind/Background Floating Elevation Distances Contributions; Also Represents Downwind Contributions Some % of the Time. Also Represents Any Emissions in the Immediate Vicinity of the Scaffolding Monitoring Station at Elevation.

CITY_21MC100_003237730

NYC-WTC_000443276

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443276Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →