NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Project Plan, AMBIENT AIR MONITORING, 130 LIBERTY ST

Machine-extracted title · confidence 42%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

NYC-WTC_000443239–000443370
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 14 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 112 of 124

14.5.3 Data Transfer and Transmittal

Hard copy and HDDs from the laboratories will be transmitted to the TRC Project QA Officer upon completion of analysis, who will forward all deliverables to the TRC Project Manager. Copies of these transmittals will be forwarded to the TRC Project Manager for storage in the project files. Each hard-copy report and EDD will be logged in to TRC’s validation tracking log. As the package proceeds through data validation, review, and data management, the status of the package will be recorded in the log. Completion of validation and final disposition of the package will also be documented.

All laboratory data will be maintained in a central file to allow easy retrieval of information and electronic transfer of the data to other parties. As laboratory analytical results are received, and validated, the results will be saved to the central file.

All laboratory data will be provided by the laboratory in both electronic and hard copy format.

After the data are validated, appropriate modifications to the data will be made to reflect the changes resulting from data validation (if any). A second quality assurance review will be performed after the validated data are entered.

14.5.4 Data Analysis and Reporting

All data reports will present summaries of all validated data collected during the field investigation.

14.6 Data Tracking and Control

Management of field data is described in Section 14.4.1. Laboratory data will be maintained as described in the laboratory’s QA Manuals. TRC is the custodian of the project files and will maintain the contents of the files, including aU relevant records, reports, logs, field notebooks, pictures, subcontractor reports, and data reviews in a secured, limited access area.

CITY_21MC100_003237805

NYC-WTC_000443351

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443351Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →