NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 35 pages

Ambient air monitoring, 130 Liberty Street deconstruction

Machine-extracted title · confidence 54%

Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.

NYC-WTC_000442832–000442866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation

Table 5. Phase II - Structural Deconstruction Phase Sampling and Analysis Summary Location Paramctcr(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Ground/Strcct 1. Asbestos Each Day (asbestos and 1. TEM/SEM Level 2. Silica silica are sampled during 2. XRD (4 Locations) work shift) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/eVAES 8. PMio Continuously “Real-Time” 8. EB AM/Gravimetric 9. PM2.5 Each Day (PMio and PM2 5 9. EB AM/Gravimetric on 24 hour basis at each location; PMjo and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly) Off-site Roof Top 1. Asbestos Each Day (asbestos and 1. TEM/SEM and Scaffolding 2. Silica silica are sampled during 2. XRD (4 locations on roof work shift) top and 4 locations 3. Metals Each Day (24 hr. Basis) 3. ICP/MS on scaffolding)* 4. PCDDs/PCDEs 4. IIRGC/IIRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/eVAES 8. PMio Continuously “Real-Time” 8. EB AM/Gravimetric 9. PM2.5 Each Day (PMio and PM2.5 9. EB AM/Gravimetric on 24 hour basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly) * - If Phase I Asbestos and COPC Abatement proceeds below the scaffold monitors, then additional air monitoring for metals utilizing NIOSH Methods will be conducted at the exhaust manifolds on the lowest elevation of the work area grouping.

6-6

CITY_21MC100_003218806

NYC-WTC_000442855

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442855Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000441904

Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000421926

Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.

Similar indexed content

Compare copies and versions →