NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 50 pages

QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

and to Primary Contractor b. Complete data validation package shall be prepared for 20% of the samples by the laboratories and these results also shall be transmitted to the Data Validators and Primary Contractor

3. Daily communication of samples received a. Primary Contractor and/or Laboratories shall communicate daily with Data Validators and with EPA Region 2 to confirm the shipment and receipt of samples. b. Primary Contractor and/or Laboratories shall communicate daily with Data Validators and with EPA Region 2 on any issues which occurred during the sampling event and during shipment.

4. Data Validator conducts data validation a. Validated results are entered into the project database via Forms 11 Lite or Scribe or an alternative electronic format that is approved by EPA b. Validated results shall be provided from the data validator to the Primary Contractor who would then provide them to EPA Region 2

5. EPA Region 2 reviews and accepts result deliverables a. Validated test results are reviewed by EPA Risk Assessors b. Deliverables are approved and accepted c. Validated test results are uploaded into a database at EPA d. Cleaning recommendations, if necessary, are reviewed by EPA Site Coordinator

6. Occupants and Building Owners are provided with their respective results

a. Cleaning recommendation, if necessary, will be offered by the EPA b. Written notifications of analytical results will be provided by the EPA

The following communication drivers are those activities that shall necessitate communication between the Primary Contractor’s Project Monitor and EPA’s Site Coordinator. These drivers shall include:

• Approval of amendments to the QAPP; • Initiation, notification and/or approval of real time modifications; • Notification of delays or changes to field work; • Recommendations to stop work and initiation of corrective action; and • Reporting of issues related to analytical data quality, including, but not limited to, ability to meet reporting limits and turn around times.

-4-

CITY_21MC100_002649177

NYC-WTC_000442667

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442667Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →