NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos, NY DOL reference

Machine-extracted title · confidence 38%

Asbestos standards reference page from NY Department of Labor materials.

NYC-WTC_000441450–000441560
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(a) Regulated Abatement Work Area Preparation. The regulated abatement work area shall be pre-cleaned, isolated and negative air established in accordance with Subpart 56-7 of this Part.

(b) Use of Amended Water. Areas that may be disturbed during the installation of hangers or other support and framing materials for the enclosure shall be sprayed with amended water. These areas shall be kept damp to reduce airborne asbestos concentrations.

(c) Loose and Hanging Asbestos Material. Loose or hanging ACM, PACM or asbestos material shall be removed in accordance with the requirements of Section 8.4 of this Subpart.

(d) Repair of Fireproofing and Thermal Insulation. After installation of hangers, brackets or other enclosure supports, and before installation of encasement/enclosure sheathing material, damaged areas of fireproofing and thermal insulation shall be repaired using a non-asbestos material as per Section 56-7.2 of this Part. Surfaces shall be prepared and replacement material applied in accordance with manufacturer’s recommendation.

(e) Integrity of Installation. Encasements/enclosures shall be designed to be permanent and shall be constructed to provide an airtight barrier. The encasement/enclosure sheathing material shall be impact resistant and shall be installed with adequate supports, reinforced to withstand local environmental conditions, casual contact and any internal pressures developed within the encasement/enclosure structure.

(f) Utility Maintenance. Utilities shall be lowered as necessary and reinstalled in a manner which allows proper utilization, and does not disturb the integrity of the encasements/enclosures. Utility maintenance shall not require the encasements/enclosures to be opened or disturbed.

(g) Ducts. Ducts insulated with ACM, PACM or asbestos material shall not be encased or enclosed.

(h) Air Plenums. ACM, PACM or asbestos material-insulated air plenums, which are not readily accessible for inspection, shall not be encased or enclosed.

(i) Marking or Labeling. Encased asbestos material shall be conspicuously marked or labeled in order to warn persons of its presence.

(j) Cleanup. Waste cleanup shall be in accordance with Subpart 56-8.5.

(k) Final Cleaning and Clearance Air Sampling. Final cleaning and clearance air sampling shall be in accordance with Subpart 56-9.

56-8.9 Equipment and Waste Container Decontamination and Removal Procedures.

12 NYCRR56 Subparts, Page 83

CITY_21MC100_003240945

NYC-WTC_000441533

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441533Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →