NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Chain-of-custody for NY asbestos regulation, Part 56

Machine-extracted title · confidence 52%

Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.

NYC-WTC_000438568–000438677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

including size, age, use and prior use of the building/structure or area; (iv) The name and phone number of the building/structure or area owner representative or site contact individual.

(V) The amount of ACM, PACM or asbestos material present in square feet and/or linear feet, and/or cubic feet, if applicable. Piping, fittings and associated insulation (excluding breeching) are to be measured in linear feet;

(vi) Room designation numbers or other local information where ACM, PACM or asbestos material is found, unless such material is found throughout the entire building or structure;

(vii) The commencement and completion dates for the asbestos project. Phase II A through D, and the commencement and completion dates of any intermediate portions of the project. Night, weekend and shift work schedules shall be included;

(viii) The procedures and equipment, including ventilating/exhaust systems, that shall be employed;

(ix) A listing of all variances (applicable and site-specific) to be utilized on the asbestos project;

(X) The name and asbestos license number of the air sampling firm asbestos contractor for the asbestos project;

(Xi) The name and NYS ELAP registration number of the laboratory which shall perform analysis of project air samples for the project;

(xii) The name, address, phone number and NYS DEC permit number of the waste transporter;

(xiii) The name, address and phone number of the landfill where the asbestos waste will be transported;

(xiv) Any other information which the Commissioner may require.

(3) A separate notification must be submitted for each period of up to twelve (12) months during which work shall be performed. Amendments of existing notifications are permitted. No additional fee is required unless the size of the project increases from that originally submitted on the initial notification, then a fee would be required for the additional material only.

(4) Postponement, Cancellation or Changes to Completion Dates of Projects.

12 NYCRR56 Subparts, Page 31

CITY_21MC100_003246523

NYC-WTC_000438598

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000438598Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →