NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Chain-of-custody for NY asbestos regulation, Part 56

Machine-extracted title · confidence 52%

Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.

NYC-WTC_000438568–000438677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS

SUBPART 56-1 GENERAL PROVISIONS 5 56-1.1 Title and Citation. 5 56-1.2 Purpose and Intent of Part. 5 56-1.3 AppliGation, 5 56-1.4 Responsibility of General Contractor or Construction Manager, 6 56-1.5 Responsibility for Cleanup of Uncontrolled Disturbance. 6 56-1.6 Other Codes. 6 SUBPART 56-2 DEFINITIONS 7 56-2.1 Terms 7 Table 1 9 SUBPART 56-3 ADMINISTRATIVE 20 56-3.1 Licensing Requirements and Procedures. 20 56-3.2 Certification Requirements and Procedures. 22 56-3.3 Replacement of Licenses and Certificates. 27 56-3.4 Notice and Record-keeping Requirements. 28 56-3.5 Emergency Asbestos Project Notification. 33 56-3.6 Notification of Residential and Business Occupants. 33 SUBPART 56-4 GENERAL PROJECT AIR SAMPLING & LAB ANALYSIS REQUIREMENTS 36 56-4.1 Qualifications of Air Sampling Personnel. 36 56-4.2 Laboratory Gertification. 36 56-4.5 Independent Third Party Sampling and Analysis. 36 56-4.4 Asbestos Contractors Allowed to Perform Project Air Sampling on an Asbestos Project. 36 56-4.5 Air Sample Log. 36 56-4.6 Test Methods. 37 56-4.7 Air Sampling Equipment. 37 56-4.8 Area Air Sample Analysis and Results - General Requirements. 38 56-4.9 Number and Location of Samples Required 38 56-4.10 Work Stoppage Criteria During Phase II A through II G. 39 56-4.11 Phase 11 C Satisfactory Clearance Air Sample Results Criteria. 39 56-4.12 Unsatisfactory Clearance Air Sample Results. 40 Table 2 41 SUBPART 56-5 PHASE lA: ASBESTOS SURVEY PLANNING AND DESIGN 42 56-5.1 Asbestos Survey Requirements 42 SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING 48 56-6.1 General Requirements. 48 56-6.2 Number and Location of Background Air Samples 48 56-6.3 Establishment of Background Level. 48 SUBPART 56-7 PHASE II A WORK AREA PREPARATION 49 56-7.1 Air Sampling Requirements. 49 56-7.2 Materials and Equipment. 50 56-7.3 Asbestos Abatement Contractor Daily Project Log. 51 56-7.4 Establishing Each Regulated Abatement Work Area. 52 56-7.5 Personal and Waste Decontamination System Enclosures 52 (a) installation. 52

12 NYCRR56 Page 2

CITY_21MC100_003246494

NYC-WTC_000438569

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000438569Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →