Ambient air monitoring program, 130 Liberty Street

Machine-extracted title · confidence 54%

Ambient air program report for 130 Liberty Street deconstruction August 2005.

NYC-WTC_000438517–000438547
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1.2 Project Purpose and Objectives

The principal purpose of the air monitoring program is to monitor air quality in the vicinity of 130 Liberty Street during the deconstruction of the building on that property. The Proposed Plan consists of monitoring of fugitive dusts in the vicinity of the deconstmction site on both a real­ time or continuous basis as well as a time-weighted or integrated basis.

Principal objectives of the program are as follows:

• Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that fugitive dusts associated with the building deconstruction are maintained below predetermined action levels.

• In the event that fugitive dusts levels exceed predetermined action levels, building deconstruction management personnel will be immediately notified so that all necessary corrective actions can be taken.

Monitor PMio and PM2 5 on a time weighted or 24-hour average basis to provide assurances that levels of respirable particulate matter associated with the deconstruction are below 24 hour National Ambient Air Quality Standards (NAAQS) of 150 ug/m^ and 65 ug/m\ respectively.

• Collect particulate matter on a time-weighted or integrated basis such that samples are available for monitoring of target compounds potentially associated with World Trade Center dust (e.g., asbestos, lead).

• Compare measured concentrations of project target parameters to action levels established on a compound specific basis. In the event that measured concentrations exceed any project specific action level for one or more of these target compounds, appropriate corrective actions immediately will be taken.

1.3 Overview of Air Quality Monitoring Programs and Features

There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 130 Liberty Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:

“Level 1”: The subcontractors performing aspects of Phase I deconstruction work (largely interior, non-structural efforts) will be responsible to collect air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA.

“Level 2”: The next layer of sampling is for ICR 56 compliance. ICR 56-required sampling will be performed by the third party consultant who will sample the ambient air inside the building during Phase I work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In addition, samples will be collected outside

L2005-149 (081205)v2 1-2 5023623.2

CITY_21MC100_003243379

NYC-WTC_000438521

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000438521Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000427190

Chain-of-custody for August 2005 ambient air monitoring at 130 Liberty Street deconstruction site, LMDC.

Similar indexed content

Compare copies and versions →