NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental plan, Greenwich/Thames Street, 2005

Machine-extracted title · confidence 44%

Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.

NYC-WTC_000437816–000437949
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

constructed of borosilicate glass, is filled with the PUF plug, and is connected to the sampling pump by way of flexible tubing. Pump flow rates of each personal sampling pump, with a representative sampler in line, will be measured before and after sample collection. The pump will be run for 10 minutes prior to checking the flow rate. A suitable rotometer (or bubble meter) will be connected to the filter inlet, the flow screw adjusted to the desired sampling value, and the flow rate observed on the rotometer (or bubble meter) will be verified as constant for a minimum of 20 seconds. Flow rates will be recorded on Field Sampling Data Sheets or an equivalent field logbook. To initiate sample collection, the aluminum foil is removed from the pre-cleaned cartridge assembly (foil returned to the jar for later use) and the cartridge is attached to the pump with flexible tubing. The sampling assembly is positioned with the intake downward or in a horizontal position. The samplers are fastened to a location (i.e., on a tripod) near the individual’s breathing zone at least 30 meters from any obstacle from air flow with the PUF intake and at least 1 to 2 meters above ground level. After the PUF cartridge is correctly inserted and positioned, the power switch is turned on, the elapsed time meter is activated, sampling begins, and the start time is recorded on the Field Data Sheet or equivalent field logbook. At the conclusion of each sampling period, the power switch is turned off, stop time recorded, the PUF cartridge is removed from the pump and wrapped with its original aluminum foil, the Teflon® end caps are replaced on the cartridge, and it is placed back into its original sealed and labeled container, placed in an ice chest under ice (< 4°Cj, and transported to the analytical laboratory for processing. Equipment and supplies utilized with this sampling approach are as follows:

• Low-Volume, Continuous Flow Personal Sampling Pump - SKC Leland Legacy Personal Monitor and Sampling Pump (or equivalent): 5 to 15 1pm. • Battery Pack - Rechargeable lithium-ion battery pack (or equivalent) compatible with the personal sampling pump. • Sampling Cartridge - Constructed from a 20-mm (l.D.) by 10-cm borosilicate glass tube drawn down to a 7-mm (O.D.) open connection for attachment to the pump by way of flexible tubing. • Polyurethane Foam (PUF) Plugs - Cut into a cylinder, 22-mm (l.D.) and 7.6-cm long, fitted under slight compression inside the cartridge. Polyether type (density 0.0225 g/cm3). Plugs should be slightly larger in diameter than the internal diameter of the cartridge. Pre-extracted PUF plugs and glass cartridges may be obtained commercially. • Teflon® End Caps - For sample cartridge. Must fit tightly to provide an adequate seal to prevent pre- or post- sampling exposure to other potential sources of the target analytes. • Glass Sample Cartridge - For sample collection. The analytical laboratory will insert the PUF plug into the glass sample cartridge during pre-sampling preparation. • Flexible Tubing - Used to connect the cartridge assembly to the sampling pump. • Sample Cartridge Shipping Containers - The analytical laboratory will provide individually labeled containers that will be used to transport the sample cartridges

61

CITY_21MC100_003220067

NYC-WTC_000437876

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437876Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441133

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000453085

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

Similar indexed content

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

Compare copies and versions →