NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos chain-of-custody, NYC WTC project, 2006

Machine-extracted title · confidence 50%

Asbestos chain-of-custody record for NYC WTC project, including state code reference.

NYC-WTC_000437549–000437661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

visual inspection for completeness of abatement and cleaning, prior to commencement of the project monitor visual inspection.

(1) Project Monitor Visuai Inspection. An appropriately trained and certified project monitor, contracted by the building/structure owner, independent of the asbestos abatement contractor, shall complete the visual inspection. The project monitor visual inspection for completeness of abatement and completeness of cleanup shall be performed as per the provisions of the current ASTM Standard E1368 "Standard Practice for Visual Inspection of Asbestos Abatement Projects”. If the property owner is the asbestos abatement contractor for the asbestos project, the owner shall contract with an independent project monitoring firm asbestos contractor for the necessary visual inspection on the asbestos project. The asbestos abatement contractor and property owner, prior to the scheduling of the required visual inspection, shall provide a complete abatement scope of work for the asbestos project to the project monitor. An entry shall be made into the asbestos abatement contractor supervisor’s daily log by both the supervisor and the individual performing the inspection, detailing the findings of the visual inspection. The full name and NYSDOL asbestos handling certificate number of the certified individual performing the inspection shall also be documented in the supervisor’s daily log.

(e) Exemption From Multiple Cleaning And Sheeting Removal. When the regulated abatement work area is not required to be plasticized, or when a tent enclosure unit is used, one thorough final cleaning followed by the observance of the appropriate waiting/settling or drying time requirement of this Subpart shall be required. For regulated abatement work areas where one (1) layer of plastic sheeting is allowed, such as the use of spray plastic or pre-demolition asbestos projects, two (2) cleanings (first and final), each followed by observance of the appropriate waiting/settling or drying time requirements of this Subpart is required. Cleanings shall consist of all surfaces in the regulated abatement work area being HEPA vacuumed first and then wet-cleaned.

(f) Waiting/Settling And Drying Times Requirements. For sequential removals as per Section 56-8.6(b), the most stringent waiting/settling/drying time shall be observed.

(1) The following waiting and drying times per material abated shall be observed for each stage of cleaning as per this Subpart:

(i) fireproofing, plaster, TSI and other friable materials - 12 hours (ii) abrasive removals of floor tile/mastic with machinery - 12 hours (such as a bead blaster, grit blaster, etc.) (iii) manual removal of floor tiles/mastic - 4 hours (iv) manual abatement of interior non-friable materials - 4 hours

12 NYCRR56 Subpart 9, Page 88

CITY_21MC100_012001713

NYC-WTC_000437637

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437637Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →