NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos chain-of-custody, NYC WTC project, 2006

Machine-extracted title · confidence 50%

Asbestos chain-of-custody record for NYC WTC project, including state code reference.

NYC-WTC_000437549–000437661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

information for each asbestos project, if it relates to their portion of the asbestos project:

(i) The name, address, social security number and asbestos certificate number of the person who supervised the asbestos project;

(ii) The location and description of the asbestos project;

(iii) The amount of asbestos or asbestos material that was removed, enclosed, encapsulated, repaired, disturbed or handled;

(iv) The commencement and completion date of the asbestos project;

(v) The name, asbestos handling license number, and address of the air sampling asbestos contractor that was used on the project;

(vi) The name, address and current NYS ELAP registration number, of the laboratory that was used for air sample analysis on the project;

(vii) The name, asbestos handling license number, and address of the project monitoring asbestos contractor that was used on the project;

(viii) The name and address of the deposit or waste disposal site or sites where the asbestos waste material was deposited or disposed;

(ix) The name and address of any sites that were used for the interim storage of asbestos or asbestos waste materials prior to final deposit or disposal;

(x) The name and address of any transporters that were used to transport asbestos or asbestos material;

(xi) The name, address, social security number and asbestos license or certificate number of all persons who were engaged on that portion of the asbestos project for which the asbestos contractor has responsibility;

(xii) A copy of the asbestos abatement supervisor’s daily project log;

(xiii) Any other information that the Commissioner may require, on a form and according to instructions provided by the Commissioner.

(2) Project Record.

(i) At all sites where there is an active project, a project record shall be required. The project record shall be available on-site with the

12 NYCRR56 Subparts, Page 28

CITY_21MC100_012001653

NYC-WTC_000437577

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437577Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →