NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 19 pages

WTC unoccupied building monitoring documentation, 2002

Machine-extracted title · confidence 50%

Documentation for building monitoring program at 125 Cedar Street by DEP and ATC.

NYC-WTC_000435280–000435298
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Final Report 125 Cedar Street, NYC, NY

variability, variations in contaminant concentrations, and sampling and analytical accuracy. The acceptable results of the sampling represent conditions found on the dates the samples were collected. Individual analytes specified earlier were again analyzed in accordance with the project specifications utilizing the following analytical procedures:

• Lead, EPA Method SW-846-6010B • PAHs, ASTM-6661-01, EPA Method SW-846-8270C • Dioxin, ASTM-6661-01, EPA Method SW-846-8290 • Mercury, EPA Method SW-846-7471A

Scope of Work

All work performed was conducted in compliance with general industry practices, applicable relevant and appropriate regulations, including, but not limited to the USEPA, USDOL, NYSDOL, NYSDEC, NYCDEP, NYCDOS, and NYCDOH. The scope of work entailed a thorough cleaning of visible dust accumulations from all surfaces within each apartment unit, except as noted within the Project specifications. Cleaning entailed the use of water to mist material prior to cleaning without generating water accumulations. All waste was subsequently double bagged and appropriately labeled prior to disposal. On occasion, equipment that proved to be difficult to clean via wet wiping techniques (i.e.: electrical equipment, fin tube radiators, appliances, etc.) was cleaned by using low pressure compressed air to dislodge settled dust prior to cleaning.

Project Description

Work Sequence

The following lists the sequence for cleaning of accumulated dust:

Mobilized equipment and personnel to job site (ATC and Action). Collected and analyzed background wipe samples (ATC). Posted warning signs to establish regulated work areas (Action). Constructed engineering controls per Contract Documents and current regulations (Action). Performed pre-abatement inspection of Contractor engineering controls (ATC). Collected ambient air samples to monitor airborne fiber levels (ATC). Performed required clean-up of settled dust (Action). Performed oversight of Contractor work practices (ATC) Performed proper removal and disposal of geenerated waste from the work areas (Action). Performed visual inspections to ensure no visible debris remaining in work areas (ATC).

ATC Project No. 15.22906.0002 Pages

CITY_21MC100_009480708

NYC-WTC_000435285

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435285Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000432891

WTC unoccupied building monitoring documentation for 125 Cedar Street, Dec 2002.

Similar indexed content

Compare copies and versions →