NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Continuation of the asbestos validation SOP text with definitions and scope.
NYC-WTC_000434918–000435017OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Pt. 763. Subpt. E. App. A 40 CFR Ch. I (7-1-00 Edition) analysis to exceed the 70 s/mm^ concentra 11. After finishing with a grid, remove it tion. (Generally this means the first four fi from the microscope, and replace it in the bers identified as asbestos must exhibit an appropriate grid holder. Sample giids must identifiable diffraction pattern for chrysotile be stored for a minimum of 1 year from the or amphibole.) date of the analysis; the sample cassette e. The micrograph number of the recorded must be retained for a iiiiniiiium of 30 days diffraction patterns must be reported to the by the laboratory or returned at the client’s client and maintained in the laboratory’s request. quality assurance records. In the event that examination of the pattern by a qualified in G. Sample Analytical Sequence dividual indicates that the pattern has been 1. Under the present sampling require misidentified visually, the client shall be ments a minimum of 13 samples is to be col contacted. lected for the clearance testing of an abate f. Energy Dispersive X-ray Analysis ment site. These include five abatement area (EDXA) is required of all amphiboles which samples, five ambient samples, two field would cause the analysis results to exceed blanks, and one sealed blank. the 70 s/mm- concentration. (Generally 2. Carry out visual inspection of work site speaking, the first 4 amphiboles would re prior to air monitoring. quire EDXA.) 3. Collect a minimum of 5 air samples in g. If the number of fibers in the non side the work site and 5 samples outside the asbestos class would cause the analysis to work site. The indoor and outdoor samples exceed the 70 s/mm^ concentration, the fact shall be taken during the same time period. that they are not asbestos must be con 4. Remaining steps in the analytical se firmed by EDXA or measurement of a zone quence are contained in Unit IV of this Ap axis diffraction pattern. pendix. h. Fibers classified as chrysotile must be identified by diffraction or X-ray analysis H. Reporting and recorded on a count sheet. X-ray anal 1. The following information must be re ysis alone can be used only after 70 s/mm^ ported to the client for each sample ana have been exceeded for a particular sample. lyzed: i. Fibers classified as amphiboles must be a. Concentration in structures per square identified by X-ray analysis and electron dif millimeter and structures per cubic centi fraction and recorded on the count sheet. (X- meter. ray analysis alone can be used only after 70 b. Analytical sensitivity used for the anal s/mm^ have been exceeded for a particular ysis. sample.) c. Number of asbestos structures. j. If a diffraction pattern was recorded on d. Area analyzed. film, record the micrograph number on the e. Volume of air sampled (which must be count sheet. initially supplied to lab by client). k. If an electron diffraction was attempted f. Copy of the count sheet must be included but no pattern was observed, record N on the with the report. count sheet. g. Signature of laboratory official to indi 1. If an EDXA spectrum was attempted but cate that the laboratory met specifications not observed, record N on the count sheet. of the method. m. If an X-ray analysis spectrum is stored, h. Report form must contain official lab record the file and disk number on the count oratory identification (e.g., letterhead). sheet. i. Type of asbestos. 10. Classification Rules. I. Quality Control/Quality Assurance a. Fiber. A structure having a minimum Procedures (Data Quality Indicators) length greater than or equal to 0.5 Llm and an aspect ratio (length to width) of 5:1 or great Monitoring the environment for airborne er and substantially parallel sides. Note the asbestos requires the use of sensitive sam appearance of the end of the fiber, i.e., pling and analysis procedures. Because the whether it is flat, rounded or dovetailed. test is sensitive, it may be influenced by a b. Bundle. A structure composed of three or variety of factors. These include the supplies more fibers in a parallel arrangement with used in the sampling operation, the perform each fiber closer than one fiber diameter. ance of the sampling, the preparation of the c. Cluster. A structure with fibers in a ran grid from the filter and the actual examina dom arrangement such that all fibers are tion of this grid in the microscope. Each of intermixed and no single fiber is isolated these unit operations must produce a prod from the group. Groupings must have more uct of defined quality if the analytical result than two intersections. is to be a reliable and meaningful test result. d. Matrix. Fiber or fibers with one end free Accordingly, a series of control checks and and the other end embedded in or hidden by reference standards are to be performed a particulate. The exposed fiber must meet along with the sample analysis as indicators the fiber definition. that the materials used are adequate and the
678
CITY_21MC100_011990921
NYC-WTC_000434947
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
50 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
28 shared non-person entities · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
Similar indexed content
NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similar indexed content
NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
Similar indexed content
NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
Similar indexed content
NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
Similar indexed content