NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

QA/QC Plan, Environmental Monitoring Program

Machine-extracted title · confidence 54%

Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.

NYC-WTC_000427900–000428009
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

be distributed to the appropriate personnel for response: the AIRTEK Field Sampling Coordinator will be responsible for responding to the field sampling TSA report, and the Laboratory Manager will be responsible for addressing the fixed laboratory TSA report. Significant issues that are discovered during the TSA and which could potentially affect data quality or usability will be brought to the immediate attention of the AIRTEK Project Manager. The response to the TSA reports will include a description of the corrective action(s) to be implemented, the identities of the personnel responsible for implementing the corrective action, and the schedule for implementation/completion. All responses must be completed within two weeks of issuing the TSA report. The response will be reviewed by the AIRTEK Project QA Officer and/or AIRTEK Project Manager and, if all issues have been addressed appropriately and in a timely manner, no further action will be required. In the event that the corrective action(s) are inadequate or inappropriate, follow-up activities, including additional audits, or discussions with the AIRTEK Project Manager, will be conducted by the AIRTEK Project QA Officer. The complete TSA report, including resolution of any deficiencies, will be included in the QA reports to management.

15.3 Additional QAPP Non-Conformances 15.3.1 Field Non Conformances

Corrective action in the field may be needed when the sample network is changed (i.e., more/less samples, sampling locations other than those specified in the QAPP), or when sampling procedures and/or field analytical procedures require modification, etc. due to unexpected conditions. The field team may identify the need for corrective action. The AIRTEK Field Sampling Coordinator will approve the corrective action and notify the AIRTEK Project Manager and AIRTEK QA Officer. The AIRTEK Project Manager, in consultation with the EPA Region 2 Project Manager, if necessary, will approve the corrective action. The AIRTEK Field Sampling Coordinator will ensure that the corrective action is implemented by the field team. Corrective actions will be implemented and documented in the field logbook. Documentation will include:

• A description of the circumstances that initiated the corrective action, • The action taken in response, • The final resolution, and • Any necessary approvals.

No staff member will initiate corrective action without prior communication of findings through the proper channels as described above All corrective actions will take into account the possible effect on the data. If necessary, a problem resolution audit will be conducted.

15.3.2 Laboratory Non-Conformances

Corrective action in the laboratory may occur prior to, during, and after initial analyses. A number of conditions such as broken sample media, omissions or

95

CITY_DEP_WORBY_CANNATA_SUBP_0001 01746

NYC-WTC_000427994

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427994Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →