QA/QC Plan, Environmental Monitoring Program

Machine-extracted title · confidence 54%

Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.

NYC-WTC_000427900–000428009
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

Asbestos, Mercury, and PCBs using a Personal Sampling Pump

Maintenance, testing and inspection requirements for the personal sampling pumps are as follows:

• Routine maintenance will be performed according to the manufacturer’s instructions on the following schedule:

Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampner 2,500 Motor 4,500

Note: Replacement intervals may be shorter in dusty conditions.

Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotameter, bubble meter, or other suitable flowmeasuring device that is NIST traceable. The flow rate should not vary from the set point by more than ±10%. If it does, the flow through the pump must be recalibrated.

Respirable Silica using a Personal Sampling Pump Maintenance, testing, and inspection requirements for the personal sampling pump are as follows:

• Routine maintenance of pump will be performed according to the manufacturer’s instructions on the following schedule:

Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampner 2,500 Motor 4,500

Note: Replacement intervals may be shorter in dusty conditions.

• Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotometer, bubble meter, or other suitable flowmcasuring device that is NIST traceable. The flow rate should not vary from the set point by more than ±10%. If it does, the flow through the pump must be recalibrated.

74

CITY_DEP_WORBY_CANNATA_SUBP_0001 01725

NYC-WTC_000427973

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427973Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →