NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
Lab EDD Specifications for 133-135 Greenwich Street and 21-23 Thames Street
Deconstruction Project
1) Volume Unit is set as ms.
2) If an analyte is not detected, include the quantitation limit in the concentration
column with a flag '<' in the flag column and 'U' in the qualifier column. For
detected analytes, the concentration is put in the Concentration column and there
is no need to report the quantitation limit.
3) The result units are set differently but consistent with the parameters:
Asbetos
PCME I'CITY
AHERA S/mmz
Silica ug m
PAHs* ng/ms
Metals ng m
Total Mercury ng rn
Dioxins/furans * pg/ms
PCBs ng m
* In addition, BAP equivalent (ng in ) and Dioxin TEQ (pg/ub) concentrations must
be calculated and reported in the EDD.
4) Each row in the EDD will contain information for a single analytical result from a
single run of an analytical method, and should be in the format specified below.
CaiiiiBa Fs^sS SaHMt
SSsaw
Lsb JSsaae I&B Ut! sBteeraaiEffiii Jii® iis Tesr Yes
sab K piavidEthaeisxtreEEE.
2.S ?WSaE!3pfeS> Tile sasapSE 3} prssidea by TEC si ths Ths Yes*
UKBOS-oJ-CBSSOiSy fatas.
3/C Ssaspla LiKStica, Tbs iarsSsoE festissESJif^d by Tesa Yes*
TSC OE rip ■isai-of-s'.is-nrjj-
DsKC&SSeasal Us* das Tia: tie Yaisg? sss coaetsed as Dss Yss*
aeSeSd._______________________ (siaiaiYvyygi
.S.E VatasCidSiscfed Tbs saaipiS; vibsise to K’s; .lEsiiscIsd. TW Yas*
Sioied as rest to pEass’iSS sigssScaar
iggaias.
S.F Vshisae Ejiit A laiii sassoidBi'Tvij^ Tbs vo-hssB Text Yes*
ccibtitecl
Tbs sitiiyle IE B.Eea W Tia £»b_______ Ts» Yes
Dat& Rermsd Tbs date tbst fea rsmls itas Tssaived Jjy Etee Yes*
ass L*. (sBiai’Wvyjfy'S
Dsk Ai!.i5ysed Tbs date shat tie saisiyte WS5 atijb.'zea by DaTe Yes
tbs Uh. fsaHs.aiJs'sy-'.g
109
CITY_DEP_WORBY_CANNATA_SUBP_0001 01760
NYC-WTC_000428008
OCR can misread numbers and units. Confirm readings against the page image before using them.