NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental Community Air Monitoring Plan, Greenwich/Thames

Machine-extracted title · confidence 42%

Plan for environmental community air monitoring at 133-135 Greenwich & 21-23 Thames, Sept 2005.

NYC-WTC_000426957–000427090
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Streel/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - January 27, 2006

Table 13-3c. Calibration Requirements for Tisch PUF Samplers Tisch PUF Sampler Initial Calibration; NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration. Single point flow Within =20% of the Service Tisch PUF check at normal flow rate indicated sampler and perform operating flow rate by Tisch PUF a new multi-point on weekly basis sampler calibration

Orifice Transfer Annual Calibration NA NA Standard by manufacturer and when visual inspection reveals new dents in the device. Calibration records maintained and tracked by Quality Assurance Officer and Field Sampling Coordinator.

PMio and PM2.5 Using a Reference Sampler

Calibration procedures are as follows:

• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration. The calibration records will be maintained and tracked by the Quality Assurance Officer and Field Sampling Coordinator. • Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed ±10% of the samplers indicated flow rate.

PMio and PM2.5 Using a Met One E-BAM Continuous Monitor Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates

96

CITY_DEP_WORBY_CANNATA_SUBP_000093284

NYC-WTC_000427052

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427052Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000425068

Title and approval sheet for Environmental Community Air Monitoring Program and plan at Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000427415

CoC document detailing plan for Environmental Community Air Monitoring at Greenwich Street sites.

Similar indexed content

NYC-WTC_000424476

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000426688

Plan document for environmental community air monitoring at Greenwich/Thames sites, Sept 2005.

Similar indexed content

NYC-WTC_000423370

Plan document for environmental community air monitoring at Greenwich and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →