Part V - Quality Assurance Project Plan
133-135 Greenwich Streel/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
and 21-23 Thames Street. Sampling methods, sampling QC, sample handling and custody
are discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a
general summary of target parameters, and numbers of field samples and QC samples
expected to be collected on a weekly basis for each phase of the program. Tables 7-2 and
7-3 provide a summary of sampling frequencies after the background phase has been
completed. Sampling locations are noted on Figures 7-1 and 7-2. Photographs of each site
are included in Attachment A.
Background The background ambient air sampling period will consist of one week (7
consecutive calendar days) of monitoring performed immediately prior to the start of
Abatement Phase. Samples will be collected at three (3) stations. The locations include
the roof of the school auditorium on Cedar Street, across Thames Street at the southeast
corner of Thames and Greenwich Streets, and on the top of the sidewalk bridge on
Thames Street south of the site. This third monitoring location will be located on the
sidewalk bridge through the Abatement Phase and for only a portion of the Demolition
Phase. Once the demolition of the 21-23 Thames Street reaches the third level (i.e.,
parallel to the street bridge), the monitoring station located on top of the sidewalk bridge
will need to be brought down to street level in the fenced area of the school property on
the south side of Thames Street east of 21-23 Thames Street. All target parameters wiU
be collected over a 24-hour integrated period with the exception of asbestos, silica, PMio,
PM2.5, and mercury. Mercury will be monitored utilizing a direct read mercury analyzer.
PMio and PM2.5 will be monitored continuously at each of the three (3) sites
while asbestos and silica measurements will be taken at a frequency of once per work
shift at each of the sites.
Abatement Phase: During the Abatement Phase air monitoring will take place at three
(3) stations each day. Background organics data from 130 Liberty Street will be used for
this project. Sampling for semrvolatile organics will be conducted at a once per
week frequency employing the entire station network. One day per week on a rotating
basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station
in the network. The schedule will be repeated until project completion. The semrvolatile
organic samples collected employing this weekly sampling frequency will not be
processed for analyses; rather they will be placed in archival storage at the laboratory.
A single set of samples will be selected from each weekly sampling event to undergo
analyses for PCDDs/PCDs, PAHs and PCBs. The station with the highest 24-hour
average PMlo concentration (pg/ms) recorded with a collocated organic sample each
week will be selected for semivolatile organic analyses.