NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Streel/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
with the USEPA Site Specific Trigger Level will govern. In the event that the
deconstruction project is shut down on account of an exceedance of an air quality
action level, monitoring for all parameters will continue. The purpose of the continuation
of monitoring will be to demonstrate that concentrations have been restored to acceptable
levels.
6.3.2 Target Air Quality Levels 6.3.2.1 Definitions of Exceedances Any 24-hour PM2.5
and PMio value in excess of the Target Air Quality Level will be considered an
“exceedance” and the actions described below will be taken. During the first week of
sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the
Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific
Trigger Level, will be considered an exceedance and the actions described below will be
taken. Following the first week of sampling, a rolling average will be established based
initially on the first week’s results, to which will be added daily values as results are
received from the laboratory. A rolling average value for any analyte other than PM2.5
and PMio, in excess of the relevant Target Air Quality Level will be considered an
exceedance and the actions described below will be taken.
6.3.2.2 Actions Based on Exceedances Exceedance at any of the three (3) monitoring
locations will be handled as set forth in the Part II - Environmental Community Air
Monitoring Plan During Abatement and Demolition of 133-135 Greenwich Street and 21-
23 Thames Street. Exceedances of an established Target Air Quality Level for any
analyte calculated as provided above will result in an evaluation of engineering controls
and work techniques in the source area. The evaluation of engineering controls and work
techniques shall determine whether: (i) negative pressure is being maintained in active
work areas at the required levels (ii) there are breaches in the containment in active work
areas, and (iii) there are any visible emissions from the containment areas. In addition,
the evaluation will consider other potential sources contributing to or causing the
exceedance.
6.3.3 USEPA Site Specific Trigger Levels
6.3.3.1 Definition of Exceedances Any 24-hour value (work shift value on work
days or four hour value on non-work days in the case of asbestos) in excess of the
USEPA Site Specific Trigger Level will be considered an “exceedance” and the
actions described below will be taken.
6.3.3.2 Actions Based on Exceedances Exceedance of USEPA Site Specific Trigger
Levels will result in a stoppage of work associated with the exceedance until an
evaluation of emission controls is performed and corrective action is in place. The
USEPA Site Specific Trigger Levels are applicable to individual sample results. If
any of the individual sample results exceed an USEPA Site Specific Trigger Level,
then notification must be made to the USEPA Region 2, and NYCDEP, as well as
The Greenwich Street Project, LLC. Work will be reinitiated once the USEPA
Region 2 has agreed (and NYCDEP during the Abatement Phase in the case of
22
CITY_DEP_WORBY_CANNATA_SUBP_000093210
NYC-WTC_000426978
OCR can misread numbers and units. Confirm readings against the page image before using them.