NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental Community Air Monitoring Plan, Greenwich/Thames

Machine-extracted title · confidence 42%

Plan for environmental community air monitoring at 133-135 Greenwich & 21-23 Thames, Sept 2005.

NYC-WTC_000426957–000427090
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Streel/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - January 27, 2006

work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11th, 2001 (referred to herein as “ACBM”), primarily within the Building interior, (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury- containing thermostats, etc. at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading, and cleaning of exterior surfaces of the Building (i.e. building washdown). The proposed cleanup and abatement will be conducted so that the Building can be safely deconstnicted in compliance with applicable law to allow for redevelopment of the Site. Eollowing Asbestos and COPC Abatement and Removal Phase deconstruction and removal of the remaining “clean” building components including the clean exterior brick walls, roofs, and structural wood components will be earned out. The deconstruction of the building at 133-135 Greenwich Street and 21-23 Thames Street is expected to consist generally of: (a) cleaning and preparation of the building for deconstruction; (b) deconstructing the building; (c) undertaking environmental monitoring during the deconstruction; (d) transporting and disposing of all waste and debris from the building; and (e) backfilling, grading and paving the Site as appropriate following the cleaning and deconstruction.

Regulatory Oversight The The Greenwich Street Project, LLC is the owner of 133-135 Greenwich Street and 21-23 Thames Street and is fully responsible for the cleaning and deconstruction of the building and will comply with all Eederal, State and City regulations pertaining to environmental protection, asbestos abatement, hazardous material disposal and construction. The Greenwich Street Project, LLC released the draft deconstruction plan documents including Health and Safety Plan, Community Monitoring Plan, and Waste Characterization Plan and Quality Assurance Project Plan in September, 2005 and formally submitted the plans for review to the following agencies:

• United States Environmental Protection Agency • United States Occupational Safety and Health Administration (OSHA) • New York State Department of Environmental Conservation (NYSDEC) • New York City Department of Environmental Protection (NYCDEP) • New York City Department of Buildings • New York State Department of Transportation • New York City Department of Transportation • New York City Office of Emergency Management • Eire Department of New York • New York Police Department • New York City Department of Health and Mental Hygiene

The Greenwich Street Project, LLC received comments from regulatory agencies in

20

CITY_DEP_WORBY_CANNATA_SUBP_000093208

NYC-WTC_000426976

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000426976Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000425068

Title and approval sheet for Environmental Community Air Monitoring Program and plan at Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000427415

CoC document detailing plan for Environmental Community Air Monitoring at Greenwich Street sites.

Similar indexed content

NYC-WTC_000424476

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000426688

Plan document for environmental community air monitoring at Greenwich/Thames sites, Sept 2005.

Similar indexed content

NYC-WTC_000423370

Plan document for environmental community air monitoring at Greenwich and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →