NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Ambient Air Monitoring QA Plan, LMDC, 130 Liberty

Machine-extracted title · confidence 42%

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

NYC-WTC_000426821–000426952
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z Z -< ■<

o Ambient Air Monitoring Program Section No. 13 o co g Quality Assurance Project Plan Revision No.: 0

I o 130 Liberty Street - NY, NY Date: September 7, 2005 “0 o Lower Mairhattan Development Corporation Page 98 of 124 c o CT o o' ro "0 o> o CD CD 03 Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses O Paranieter/Instrunient o Frequency of Calibration Acceptance Criteria Corrective Action o c Metals/ICP/MS Initial Calibration: daily, every 24 NA; monitored by ICV Perform necessary equipment 3 hours or every time instrument is set maintenance and check calibration CD 3 up_____________________________ standards. Initial Calibration Verification: 90-110% of true value immediately after initial calibration Continuing Calibration Verification: 90-110% of true value after every 10 samples and at end of analytical sequence Mercury/CVAFS Initial Calibration: prior to sample % RSD < 15 or ? > 0.999; percent Perform necessar y equipment analysis recovery of each standard in curve 90- maintenance and check calibration 110% when calculated with curve standards. with the exception of the lowest concentration standard which must be 75425%_________________________ Initial Calibration Verification: 90-110% of tme value immediately after initial calibration Continuing Calibration Verification: 90-110% of true value every 10 samples or every 12 hours, O whichever is more frequent and at end of analytical sequence O Dioxins & Furans/HRGC/HRMS Initial Calibration: prior to sample % RSD of RRFs must be < 10 for Perform necessary equipment m analysis; once every 6 months or unlabeled standards; % RSD of RRFs maintenance and check calibration whenever indicated by continuing must be < 20 for labeled standards. standards. o calibration S/N ratio must be > 10:1 for labeled J] standards and >5:1 for unlabeled □0 standards.

s >

c □0 o o o o CD rv) 00 tn CD

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000426919Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000421972

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000426556

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →