NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗QA plan reference for deconstruction ambient air monitoring, Sept 2005.
NYC-WTC_000426821–000426952OCR status: ok · source: pdftotext
z ■< Z ■<
o o io Ambient Air Monitoring Program Quality Assurance Project Plan 130 Liberty Street - NY, NY Section No. 8 Revision No.: 0 Date: September 7, 2005 co
I Lower Manhattan Development Corporation Page 50 of 124 “0 o c o CT o o' KJ "0 CD o 00 03 Table 8-6. Measurement Performance Criteria Tab e - Mercury by CVAFS O QC Sample or Activity DQI o Frequency Measurement Performance Criteria Corrective Action o c Field Duplicates' 1/every other *RPD < 40 when positive results for both Assess laboratory precision, and/or Precision-Overall 3 week samples are > 5x QL qualify data. o 3 *No situation where one result is detected at > 5x QL and other result is not detected Laboratory Control Sample 1/prep batch Percent recoveries 80-120% Determine cause of problem, Accuracy/Bias reanalyze, and/or qualify data. Method Blanks 1/prep batch Mercury must be < 15 ng per trap Reclean, reanalyze and/or qualify Accuracy/Bias- data. Contamination Calibration Blanks 1/10 samples Mercury must be < 50 pg Reclean, reanalyze and/or qualify Accuracy/Bias- data. Contamination Field Spikes' 4 spikes/ Percent recoveries 80-120%; %RSD < 30 Reanalyze and/or qualify data Accuracy/Bias and background phase in background phase Precision followed by 1 spike/every other week Duplicate Injections Every sample, RPDs must be < 10 when positive results Reanalyze and/or qualify data. Precision blank, QC for both injections are > 5x QL________ O Triplicate Injections Every 10 samples % RSD <10 when positive results for all Reanalyze and/or qualify data. Precision injections are > 5x QL Standard Additions 1/10 samples Percent recoveries 85-115% Recalibrate, reanalyze, and/or Accuracy/Bias O qualify data. m Breakthrough Check 1/location during Back half trap results must be < 2% of Qualify data and/or change Accuracy/Bias background phase front half trap results or < 5ng per trap subsequent sampling volumes. o Field/Trip Blanks 1/day Mercury must be < 15 ng per trap Reclean, reanalyze and/or qualify Accuracy/Bias- J] data. Contamination □0 Media Cleaning Verification 1/batch Mercury must be < 15 ng per tr ap Reclean and retest media. Accuracy/Bias- Check Contamination
s > Data Completeness Check NA Field 80%, Laboratory 95% NA Data Completeness 'Collection of Field Duplicates and Field Spikes will be alternated on a weekly basis. Reanalyze: refers to reanalysis of same digestate.
c □0 o o o o CD ID 00
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similar indexed content
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content