NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Ambient Air Monitoring Program QA Plan, 130 Liberty

Machine-extracted title · confidence 42%

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

NYC-WTC_000426556–000426687
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 2 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page? of 124

Table 8-2. Measurement Performance Criteria Table - Metals by ICP/MS..... 46 Table 8-3. Measurement Performance Criteria Table - PAHs by GC/MS-SIM 47 Table 8-4. Measurement Performance Criteria Table - PCBs by GC/ECD...... 48 Table 8-5. Measurement Performance Criteria Table - PCDDs/PCDFs by HRGC/HRMS.. 49 Table 8-6. Measurement Performance Criteria Table - Mercury by CVAFS................. 50 Table 8-7. Measurement Performance Criteria Table - Silica by XRD.......................... 51 Table 8-8. Measurement Performance Criteria Table - Asbestos by TEM/SEM*^*........ 52 Table 8-9. Measurement Performance Criteria Table - PMio and PM2.5 by Gravimetry 53 Table 11-1. Summary of Preparation and Analytical Methods........................................... 75 Table 12-1. Summary of Media, Preservation, and Holding Time Requirements............ 80 Table 13-la. Maintenance, Testing, and Inspection Activities Associated with Metals (TSP filters) Collected with High Volume Samplers..................................... 87 Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Lumex RA915-I- Mercury Analyzer.............................................................................. 88 Table 13-Ic. Maintenance, Testing, and Inspection Requirements for the PS-1 Sampler Used for PCDDs/PCDFs and PAHs................................................................ 90 Table 13-Id. Maintenance, Testing, and Inspection Requirement for the Anderson RAAS Sampler Used for PMio and PM2.5.................................................... 91 Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed Laboratory Analyses..................................................................................... .92 Table 13-3a. Calibration Requirements for High Volume Samplers............................... .94 Table 13-3b. Calibration Requirements for the Ohio Lumex RA915-I- Mercury Analyzer .95 Table 13-3c. Calibration Requirements for PS-1 Samplers................................................. .96 Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses........... .98 Table 14-1. Sample Numbering Scheme............................................................................. 107

Figures

Figure 4-1. Organization Chart and Communication Pathway............... 13 Figure 6-1. Project Timeline....................................................................... 26 Figure 7-1. Site Location Map and Ground Level Monitoring Locations 31 Figure 7-2. Roof-Top and Scaffolding Monitoring Locations................. 32 Figure 12-1. Sample Label............................................................................ 84 Figure 12-2. Chain-of-Custody..................................................................... 85 Figure 12-3. Chain-of-Custody Seal............................................................ 86

CITY_DEP_WORBY_CANNATA_SUBP_000091937

NYC-WTC_000426563

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000426563Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426821

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

Similar indexed content

NYC-WTC_000421972

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →