Ambient Air Monitoring Program QA Plan, 130 Liberty

Machine-extracted title · confidence 42%

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

NYC-WTC_000426556–000426687
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 36 of 124

Table 7-3. Phase II - Structural Deconstruction Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Ground/Street 1. Asbestos Each Day (asbestos and 1. TEM/SEM Level 2. Silica silica are sampled during 2. XRD (4 Locations) work shift) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodatcd Carbon Trap/eVAFS 8. PMio Continuously “Real-Time” 8. EB AM/Gravimetric 9. PM2.5 Each Day (PMw and I’M - 9. EB AM/Gravimetric on 24 hour basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly) Roof Top and 1. Asbestos Each Day (asbestos and 1. TEM/SEM Scaffolding^ 2. Silica silica are sampled during 2. XRD (4 locations on roof work shift) top and 4 locations 3. Metals Each Day (24 hr. Basis) 3. ICP/MS on scaffolding) 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAI Is 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/eVAFS 8. PMio Continuously “Real-Time” 8. EB AM/Gravimetric 9. PM2.5 Each Day (PMio and lAL s 9. EBAM/Gravimetric on 24 hour basis at each location; PM,,, and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly) Roof Top Location Meteorological Monitoring^ Continuously “Real-Time” Each Day

‘Meteorological monitoring will include the following parameters: wind speed, wind direction, and ambient temperature. If Phase I Asbestos and COPC Abatement proceeds below the scaffold monitors, then additional air monitoring for metals utilizing NIOSH methods will be conducted at the exhaust manifolds on the lowest elevation of the w'ork area grouping.

CITY_DEP_WORBY_CANNATA_SUBP_000091966

NYC-WTC_000426592

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000426592Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426821

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

Similar indexed content

NYC-WTC_000421972

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →