NYC-WTC_000428063
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Proposal/overview of air monitoring and construction inspection by a contractor for interior cleaning.
NYC-WTC_000425475–000425477OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Air Monitoring Requirements For 125 Cedar Street
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within days of project completion. The report shall clearly identify the work periormed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
3 of 3
CITY_DEP_WORBY_CANNATA_SUBP_000083689
NYC-WTC_000425477
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000428063
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429163
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428733
Proposal for independent air monitoring during asbestos cleanup at 125 Cedar Street; on-site TEM analysis plan.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434767
Air monitoring/consultant plan for asbestos cleaning at 125 Cedar Street, DEP Bureau of [name].
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433542
Plan detailing asbestos air monitoring by licensed contractor and on-site personnel for building interior cleanup.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416641
Consultant air monitoring and construction inspection services for a high-rise building project.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416633
Consultant air monitoring and construction inspection services for a high-rise building project.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435229
Contracted air monitoring and construction inspection for asbestos cleaning at 125 Cedar Street.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438349
DEP air monitoring contract and oversight for 125 Cedar Street cleanup.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444423
Follow-up air monitoring/inspection plan for debris cleaning at 125 Cedar Street.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442125
Air monitoring and construction inspection plan for asbestos-related cleaning at 125 Cedar Street, including on-site certified monitors.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445214
Consultant air monitoring plan and follow-up cleaning oversight for asbestos abatement.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429163
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428063
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428733
Proposal for independent air monitoring during asbestos cleanup at 125 Cedar Street; on-site TEM analysis plan.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434767
Air monitoring/consultant plan for asbestos cleaning at 125 Cedar Street, DEP Bureau of [name].
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449867
Consultant air monitoring and construction inspection services for a high-rise building project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442191
DEP air monitoring/inspection memo for 125 Cedar Street with cleaning plan.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
Similar indexed content
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
Similar indexed content
NYC-WTC_000428733
Proposal for independent air monitoring during asbestos cleanup at 125 Cedar Street; on-site TEM analysis plan.
Similar indexed content
NYC-WTC_000434767
Air monitoring/consultant plan for asbestos cleaning at 125 Cedar Street, DEP Bureau of [name].
Similar indexed content
NYC-WTC_000433542
Plan detailing asbestos air monitoring by licensed contractor and on-site personnel for building interior cleanup.
Similar indexed content