NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Final TEM air analysis, Building 4, Jan 2005

Machine-extracted title · confidence 42%

RJ LeeGroup TEM air analysis final report for Building 4, dated 1/29/2005.

NYC-WTC_000425050–000425051
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RJ LeeGroup, Inc. 350 Hochberg Road, Monroeville, PA 15146 Phone: (724) 325-1776 Fax: (724) 733-1799

Final Laboratory Report TEM Air Analysis RJ Lee Group, Inc. Report Date: 1/29/2005 350 Hochberg Road Sample Receipt Date: 1/29/2005 Monroeville, PA 15146 RJ Lee Group Job No.: ATH411066-223 USA Samples Received: 1 Method: Federal Register, 40 CFR, Part 763, October 30, 1987 Building: 4 Albany

Concentration

Filter Area Asbestos Analytical Date-Time Collected RJLG Sample Sample Area Volume Analyzed Structures Sensitivity Start Number Type Stop Sub Location (mn?) (liter) (mtrf) Chry Amph (S/mirf) (S/cc) 5238398.HT Area 1/27/2005 - 22:51:00 (SouthEast) - Carlisle Street East. 385 2000.00 0.17721 0 0 <5.6 <0.001 1/28/2005 -05:31:00 ”5.6 ROOf

Authorized Signature:/KAA Kimberly A. Allison, Manager - TEM Analysis

Notes: 1. Volumes provided by Deutsche Bank were used to calculate analytical results and sensitivities. 2. indicates results less than analytical sensitivity. “—” indicates that sample was not analyzed. 3. Sample(s) for this project were analyzed at our: Monroeville, PA (NVLAP #101208-0, NY ELAP #10844) Jacilily. 4. If RJ Lee Group, Inc. did not collect the samples analyzed, the verifiability of the laboratory's results are limited to the reported values. 5. Abbreviations: N/A-Not Applicable, Chry-Chrysotilc Asbestos, Amph-Amphibolo Asbestos, S-Structurcs. 6. Samples will be held for 90 days and then disposed of per Federal regulations. 7. These results are submitted pursuant to RJ Lee Group’s current terms and conditions of sale, including the company’s standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the maimer in which these results are used or interpreted.

See Appendix A for fiber data. Page 1 of 2

CITY_DEP_WORBY_CANNATA_SUBP_000077924

NYC-WTC_000425050

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000425050Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426022

Final TEM air analysis report dated 1/29/2005 for Building 4, RJ LeeGroup.

Similar indexed content

NYC-WTC_000429076

Final TEM air analysis report from RJ LeeGroup for Building 4, 7/22/2005.

Similar indexed content

NYC-WTC_000425709

TEM air analysis final lab report for building 4, dated 2005.

Similar indexed content

NYC-WTC_000427182

Final TEM air analysis report for building 4, dated July 29, 2005.

Similar indexed content

Compare copies and versions →