NYC-WTC_000451808
Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Plan for Community Air Monitoring at The Greenwich Street properties and related sites.
NYC-WTC_000420647–000420775OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assuiance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005
Tablel3-3c CalibrationRequfrementsftM2PS4Sainpl^ PS-1 Sampler Initial Calibration: NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration. Single point flow Within =20% of the Service PS-1 check at normal flow rate indicated sampler and operating flow rate byPS-1 sampler perform a new on weekly basis multi-point calibration
Orifice Transfer Annual Calibration NA NA Standard by manufacturer and when visual inspection reveals new dents in the device. ' * Calibration records maintained and tracked by Quality Assurance Officer and Field Sampling Coordinator.
PMio and PM2.5 Using a Reference Sampler
Calibration procedures are as follows:
• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration. The calibration records will be maintained and tracked by the Quality Assurance Officer and Field Sampling Coordinator. • Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed ±10% of the samplers indicated flow rate.
PMioand PM2.5 Using a Met One E-BAM Continuous Monitor Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates
93
CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 1, JAN. 2013 CITY_DEP_WORBY_CANNATA_SUBP_000010974
NYC-WTC_000420739
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000451808
Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420513
Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427716
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
91 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442410
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites.
92 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444945
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
90 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427582
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
89 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
90 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440780
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
90 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424189
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
89 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000444496
Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453085
Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.
Similar indexed content
Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.
Similar indexed content
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
Similar indexed content
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
Similar indexed content
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
Similar indexed content