NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Participation and procurement guidance, public works

Machine-extracted title · confidence 30%

Index/summary table for Title 11-12 procedures including MWBE participation and environmental chapters.

NYC-WTC_000418802–000418808
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(j) The bagged waste shall be wet cleaned or HEPA vacuumed and then transferred outside the tent, double bagged, and appropriately handled prior to disposal.

(k) The outer disposable suit (if 2 suits are worn) shall be removed and remain in the tent upon exiting. Following tent disposal and work site cleanup the workers shall immediately proceed to a shower at the work site. The inner disposable suit and respirator shall be removed in the shower after appropriate wetting. The disposable clothing shall be disposed of as asbestos­ containing waste material. The workers shall then fully and vigorously shower with supplied liquid bath soap, shampoo, and clean dry towels.

(1) The negative pressure ventilation equipment shall be used to filter a minimum of 6 volume changes through the tent after completion of abatement but prior to collapse of the tenUTiarrier. AU required air monitoring must be successfuUy completed before the tent/barricr is collapsed.

(ra) The tent shall be collapsed inward, enclosing the contaminated clothing. This contaminated material shall be disposed of in another plastic bag. The HEPA vacuum shaU be decontaminated and sealed.

Part 5

Clean-up Procedures

§1-111 Preliminary Clean-up Procedures §1-112 Additional Clean-up Procedures (Final)

§1-111 Preliminary Clean-up Procedures. The following clean-up requirements shaU be followed during the conduct of abatement activities on large asbestos projects;

(a) (1) Visible accumulations of loose asbestos-containing waste material shall be cleaned up:

(i) whenever sufficient asbestos-containing waste material to fill a single leak-tight container of the type commensurate with the properties of asbestos-containing waste material has been removed, or

(ii) at the end of each work shift, whichever shall occur first. Visible material shall be maintained wet until cleaned up.

(2) Visible accumulations of asbestos-containing waste material shall be containerized utilizing non-metallic dust pans and non-metallic squeegees or HEPA vacuums.

(3) Metal shovels shall noi be used to pick up or move accumulated asbestos­

ci TY_21MC100_010189105

NYC-WTC_000418803

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418803Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →