NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 30 pages

Lab report, bulk/air samples, NYC-WTC 2001-2002

Machine-extracted title · confidence 38%

Air and bulk sample results at WTC-related location; negative/positive sample counts recorded.

NYC-WTC_000417048–000417077
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r.-W?^'*SSfa-8!i 2i>-«'.W Mt*.'*.*-.. ■ CB.t

LUZii4 'UI 11:^7 1 U ; HI ILKI ] CUni^ULuta icS VV UMC-O

C, 'Ilie soot fallout patticuiate is light and misighiles in the air from the combustion of plastics, concrete and building materials.

D. floncrele dust and smoke odor is extremely .severe throughout. The nature of the explo.sion creates this special problem worthy of extensive treatment due to the fact that the types of materials are light with airborne microscopic parlieles. Prolonged exposure to the atmosphere inside the building has a tendency tn irritate the eyes and throat.

The window mounted 11 VAC units have suffered heavy damage from concrete du si and soot fallout.

The soot fallout particulate is light and floats from the combustion of p!a.rtics, concrete and building materials. All contents and .surfaces show varying degrees of soot fallout and concrete du,st. There docs appear, at this time to be a specific pattern for the migration of the soot and concrete dust, hut the end result does appear to have iilTcclcd virtutilly ail ureas on their outside sutTacca only.

Ci. All building contents show evidence of light to heavy soot fallout and concrete dmst contamination. The inside of cabinets, desks and fixtures show that the fallout has mitigated to al! surfaces inside and nut.

H- OVERVIEW WORK ISLOW

A, We intend to start with corridors, the lobby and stairwells, to keep cross contamination to a minimum. This will be rc«clcancd before the buildings opening. IJ. We will mobilize for the project with Our tnanagoment team, stipplic.s, equipment, etc. C. Our crew will consist of 27 and we anticipate the total amount of time of our involvement will be heiween 15 to 20 workdays. I), We are proposing some initial fogging work in the open air spaces while gearing up with work forces. We will concentrate on getting the common areas completed so that restoration of units may resume as soon as possible, Wc anticipate completion of the project within a month. The schedule stated above will also take into con.si deration, priorities established. IC American kestoratioii plains to have ^^..^rcctiwich ready fur rooccupancy within 15 tn 20 workdays, / \ / A rk*

09731 CITY_21MC100_008874482

NYC-WTC_000417051

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000417051Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Fax transmission cover, 2002

NYC-WTC_000421507

Fax cover sheet with route and page count; transmission metadata for DEP documents.

Similar indexed content

Compare copies and versions →