NYC-WTC_000412476
Engineering plans to shore up the World Trade Center foundations and secure site.
2 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗Engineering note on backwater and wall-tieback plan at WTC site.
NYC-WTC_000413189OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NEWSDAV. THURSDAY, OCTOBER 4, 2001
Keeping the Hudson at Bay By Kathleen Kerr staff writsr Holding back the Hudson promises to be a pains- taking job for workers et the World Trade Center site, engineers say, even though the danger of the ti^rhy river actually penetrating the basement wall of the complex is small. To reinforce the wall, workers will use a compli- rated “tieback” plan that mimics techniques used ■ to construct the wall when the Trade Center was built. The plan provides for gradual removal of de- lO-foot intervals down to about 70 feet, fol- lowed by reinforcement of the wall with lOO- foot-long steel cables. It' all, the process will take six months to a year ^St" ™ly after all the debris above the ground level is removed, said Dan Hahn, an engi- neer and senior associate with Mueser Rutledge ' hQ Co., responsible for carrying out the work. nyl “Water cannot get into the slurry wall as long as SM it’s intact, and it is intact,” said Hahn, who previ- IM ously worked for the Port Authority of New York Hfl and New Jersey for 32 years. “We don't see any rea- son why any water from the river or outside the - wall cr anyplace else would get into the ‘bethtub. ’ ” HB Nonetheless, the city is moving forward with the R? reinforcement plan because of concerns that the loss , of the six floors below ground level at the y I Trade Center could eventually destabilize the origi- jC■ rial wall construction. fco r?E Hli; , The floors were crushed when the buildings ,.. ■ above them coUapsed. £,.3! l- -, ' Jb Ths basement-under the Trade Center, called bathtub” because of its basin-like shape, YM stretches from Liberty Street to Vesey Street and from West Street to Greenwich Street. It's com- CT HH posed of a huge slab which is its floor and a four-aided slurry wall, so-called because ofthe clay HH and water mixture used in its construction. Thia initial clay mixture was later replaced by । pumped-in cement as construction of the Trade Center progressed. The slurry technique originat- ed, in Italy sometime before 1950 and was lirat used in this country on the World Trade Center, . said Hahn, who noted that he had worked on some BH of the foundations when the Trade Center was con- HH structed. In the days immediately alter the attacks, Hahn said, worries about the river either crashing or tHS seeping through the bathtub were “either hysteria Beg or wild speculation ’ The water seeping into the area, he said, comes HH from fire hoses, rain and broken water supply pipes. The bathtub comes closest to meeting the Hud- son at a bulkhead near the World Financial Cen- hB ter, which overlooks the river. There, only about ^B 200 feet separate it from the river. ^B Alter surface debris ia removed, workers will ^B penetrate debris that’s below ground level, 10 feet BH at a time. At each atop,' they -will drill into existing holes in the wall at a 45-degree angle, drill ^B through to the rock behind and install the stoBl ca- gj™ bles. Then theyTl grout around the cables with ce- Mb meat, sand and water. To make sure the wall remains stable, the com- EEi pany is starting now to drill moni toiing holes into UH which pipes can be inserted to make sure there ia no movement. Digital tilt meters will be affixed to the wall to perform a similar function. Phota 'ar FUbert M»cm Finally, cranea will be allowed to work only in certain locetiona over the existing wall in order to A crane load! Deel that came from the wrectage of As Worid Trade Center onto e barge In Uh Hudton River yetterday. further ensure stability. i
CITY_21MC100_011830718
NYC-WTC_000413189
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000412476
Engineering plans to shore up the World Trade Center foundations and secure site.
2 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412802
New York Times excerpt; description of recovery work and agencies involved.
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412264
Narrative about debris search at Fresh Kills Landfill in Staten Island after 9/11.
1 shared non-person entities · 1 shared topics · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413188
Newsprint feature detailing restoration progress and command center reduction.
1 shared non-person entities · 1 shared topics · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412376
Disaster casualty listing and related coverage from Sept 11 aftermath.
2 shared non-person entities · 1 shared topics · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412783
US News & World Report analysis of NYC’s post-attack redevelopment plans.
1 shared non-person entities · 1 shared topics · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413402
Analysis of subway tunnel repair costs and timelines post-9/11.
1 shared non-person entities · 1 shared topics · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
2 shared non-person entities · 1 shared topics · similarity 0.895
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141744
Newspaper excerpt reporting on the selection of a planner to lead the Lower Manhattan Development Corporation's rebuilding efforts.
2 shared non-person entities · 1 shared topics · similarity 0.885
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
2 shared non-person entities · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152214
News article discussing gaps in City's post-attack security measures and recommendations for comprehensive defense strategy.
2 shared non-person entities · 1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
2 shared non-person entities · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000412476
Engineering plans to shore up the World Trade Center foundations and secure site.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152263
A financial document from the Department of Environmental Protection dated late September 2001 regarding water supply operations.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141744
Newspaper excerpt reporting on the selection of a planner to lead the Lower Manhattan Development Corporation's rebuilding efforts.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412264
Narrative about debris search at Fresh Kills Landfill in Staten Island after 9/11.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413188
Newsprint feature detailing restoration progress and command center reduction.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000412476
Engineering plans to shore up the World Trade Center foundations and secure site.
Similar indexed content
NYC-WTC_000412802
New York Times excerpt; description of recovery work and agencies involved.
Similar indexed content
A financial document from late September 2001 related to water supply operations and emergency response costs.
Similar indexed content
NYC-WTC_000412264
Narrative about debris search at Fresh Kills Landfill in Staten Island after 9/11.
Similar indexed content
NYC-WTC_000413188
Newsprint feature detailing restoration progress and command center reduction.
Similar indexed content