NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

9/11 debris recovery operation overview, Sept 2001

Machine-extracted title · confidence 25%

New York Times excerpt; description of recovery work and agencies involved.

NYC-WTC_000412802–000412804
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

THE NEW York times, Thursday, September 2?,, 2oai '.'How long it all might take has been Through Tuesday, 115,000 tons of estimated as anywhere from six : debris had already been cleared, ev­ demcath the site was the man-made months to a year and a half, said Dan erything from airplane parts to steel wall, built deep in the center’s foun- Hahn, an engineer at Mueser Rut­ girders. Immense nets were dragged ' dation to keep out the Hudson River, ledge. He admitted, though, that even across the fronts of nearby buildings that is called the "slurry wall." that range was no better than, in the . to prevent broken glass from snap­ "They asked us to give them a i • slightly cleaned-up parlance that ping off and being carried by the ' method of putting cranes around the construction workers often use, a wind into the demolition site. site so that they do not collapse the > wild guess. Now, as the search for survivors , slurry wall,” Mr. Hahn said. winds down, the focus has turned to Some ingenuity ultimately pro­ The Morning Meeting clearing some of the remaining vided the crane operators with the structures from the site. The implo­ reach they wanted. Using steel : "Thegreatestexcavationjobincity beams from the wreckage itself, en­ history is being coordinated out of sion of the two 110-story towers was ' so complete that the 1,350-foot-tall . gineers built a submerged platform the second floor of Public School/ about 30 feet back from the retaining (Intermediate School 89, just north of i buildings crumbled into piles that ' reach no higher than 60 feet. But wall, placed another beam directly ,ground zero. Boxes filled with hard on top of it and ran a sort of steel hats, goggles and respirators are slivers of the skyscrapers survived, as did much larger sections of the bridge between the platform and the 'Stacked in an entrance hallway, next wall. One of the firms, Amec, then , to' a “Where’s Waldo?” book left surrounding buildings, 4, 5 and 6 ' World Trade Center. drove its largest crane, capable of .behind by schoolchildren; lifting 500 tons of steel, onto the ; Each day at 9 a.m., the engineers, Starting on Tuesday, crews turned to the now globally recognised piece bridge. fire department chiefs, federal j Of course, not all of the engineer­ ; emergency response coordinators | of 2 World Trade Center, a Gothic- looking shard of steel that reaches ing at the site is of the seat-of-the- and representatives from a collec­ pants variety. A computerized sys­ tion of other city agencies, from sani­ 150 feet into the sky, as well as BO feet into the ground, a piece some have tem keeps track of the positions, tation to transportation, pack into a i weights and reach of all the cranes classroom. Michael J. Burton, the suggested should be preserved as a memorial. on the site, and engineers are using ; executive deputy commissioner of sophisticated detection systems ' the city’s Department of Design and , Demolition consultants examined , a variety of options for bringing this flown on planes and helicopters to Cbnstruction, presides, ''In the room are the top officials piece down: planting small explo­ from the four contractors that are sives; sending a worker to the top keep track of everything from the J doing the heavy work in each of four : with a crane and cutting it down, warmth of the ground to its changing quadrants mapped on the site: Bovis < piece by piece; or using giant exca­ topography. ' Lend Lease, Amec Construction. vators, with cables lashed around the Beneath the surface, like astro- ] Management, Turner Construction structure, to yank it to the ground. . nauts exploring an unfamiliar plan- , Company and Tully Construction After reviewing the safety and ; et, engineers are mapping the ' Company. They all have extensive speed of the options, they opted for smashed geography of the basement J and impressive accomplishments in the giant excavators. On Tuesday, ■ that ran beneath nearly the entire building; Euro Disney to Che Interna­ shortly after 5 p.m., workers and complex. tional Arrivals Terminal at Kennedy emergency personnel were pulled The six concrete floors of the base­ ■ Airport. , away and the excavators started to ment held up the slurry wall before -By the time the morning meeting yank back and forth. The steel the terrorist attacks. In some places, convenes, a game plan has already, swayed, slowly. But it did not break. engineers said, they believe that only to, a large extent, been worked out. Again and again came more pulling, debris now holds it up. So construc­ Mr. Burton, consulting with engi­ yet the steel merely bent. Nearly a tion crews must remove the debris ' neers and others, has examined aeri- half-hour after this job started, the with exquisite care, bracing the wall steel suddenly began to twist and as they go. ( al maps of progress from the day crack. Debris flew into the air, the before and infrared maps that track beams pivoted and then snapped. A the shifting locations of remaining plume of dust again rose into the air, ; Emotional Toil In the Rubble I fires. as falling pieces hit the ground. But The work proceeds each day ac­ I Daily plans of action for the four most of the steel remained, waiting cording to the regimented plans. Re­ quadrants are then laid out. The col­ for a second assault. move one wrong beam, and an entire lection of talent is remarkable, but so sector could cave in. Pull up the . far the egos have been suppressed. ' Ingenuity With Cranes wrong pile of debris and flames shoot , The participants say the meetings, ■ up. But it can be much worse: at any driven by the awesome challenge Of all the engineering challenges tackled at the site so far, the great­ moment, workers can come across sitting just beyond the school’s play­ human remains. ground, have been sharp, the dis­ est, and most critical, was finding a way to safely find and anchor the “On the site, there are times when putes limited. “Any issue that might come up, giant cranes that would then begin any question can be answered right 1 the sad but impressive work of re­ ; there on the spot,”’ said Daniel A. ■ moving the largest pieces of the cen­ ) Cuoco, a managing principal at LZA / ter's shattered remains. Thomton-Tomasetti, one of the engi­ The task, simple to state, but deep­ neering companies: “It is boom, ly risky to execute, was to find a way । boom, boom, one topic after another.; to position the cranes so they could' There is nothing at all superfluous.” ' reach far enough over the wreckage From the day after the attack, the ( to do significant work, but somehow first assignment was obvious; clear not create too much pressure on the access to the site for rescue workers gro’ind on which the cranes sat. Un- and then clear space for the heavy machinerv. _ - -

CITY_21MC1OO_O1183O2O8

NYC-WTC_000412803

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000412803Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000412303

Describes debris at the World Trade Center site and transit damage.

Similar indexed content

Compare copies and versions →