Debris transfer, Staten Island plan draft, Oct 2001

Machine-extracted title · confidence 28%

Draft environmental health and safety plan for debris transfer and landfill operations, Oct 2001.

NYC-WTC_000408541–000408613
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Staten Island Landfill Debris Disposal Operation Health and Safety Program

accumulate in the structures and therefore creates a need for continuous monitoring. Continuous LEL/Hydrogen Sulfide monitors will be installed in ail operational structures on the top of the landfill. Additionally, onsite workers should be aware that hydrogen sulfide, methane/carbon dioxide (landfill gas mixture) could accumulate in low-lying areas of the landfill. Care should be taken when working in low lying areas and monitoring should be conducted especially when air circulation is minimal.

4.3 CHEMICAL HAZARDS

4.3.1 Asbestos

Asbestos has been detected in both bulk dust samples and air samples at Ground Zero. As of October 3,2001, the USEPA and OSHA collected 177 bulk dust and debris samples and had them analyzed for asbestos content, and 48 samples contained over 1 percent asbestos by visual estimation. As a result, the potential of exposure to workers exposed to particulate debris may be a potential concern. Unfortunately, the non-homogeneous characteristics of the waste stream will make it very difficult to conduct a negative exposure assessment since the composition of the waste stream may change daily, depending on the characteristics of the materials.

Although the City and the State of New York maintain asbestos management programs for the proper identification, removal, disposal, and air monitoring of asbestos projects by licensed firms and individuals, it is clear that the elements surrounding this disaster will not provide for traditional management techniques. The standards were designated to address the identification and removal of “in-place” asbestos containing materials (ACM). The primary concern of this plan is to assess exposure of workers to potential asbestos-containing debris. PPE and engineering controls will be used to minimize potential worker exposure and personnel air monitoring should be conducted to assess PPE effectiveness.

45

NYC-WTC_000408588

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408588Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →